<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>SR-99 Tunnel » The Urbanist</title>
	<atom:link href="https://old.theurbanist.org/category/transportation/driving/highways/sr-99-tunnel/feed/" rel="self" type="application/rss+xml" />
	<link>https://old.theurbanist.org</link>
	<description>Advocacy journalism for better cities.</description>
	<lastBuildDate>Sat, 28 Dec 2024 21:10:04 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	

<image>
	<url>https://old.theurbanist.org/wp-content/uploads/2015/06/The-Urbanist-Logo-32x32.png</url>
	<title>SR-99 Tunnel » The Urbanist</title>
	<link>https://old.theurbanist.org</link>
	<width>32</width>
	<height>32</height>
</image> 
<site xmlns="com-wordpress:feed-additions:1">63163413</site>	<item>
		<title>Seattle Waterfront Park Project Finally Enters Its Home Stretch</title>
		<link>https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/</link>
		
		<dc:creator><![CDATA[Doug Trumm]]></dc:creator>
		<pubDate>Wed, 20 Mar 2024 14:00:00 +0000</pubDate>
				<category><![CDATA[Features]]></category>
		<category><![CDATA[Parks and Public Space]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<category><![CDATA[Walking]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=177171</guid>

					<description><![CDATA[<p>A new aquarium and "Overlook Walk" to Pike Place Market headline a revamped Seattle Waterfront just one year away from its grand opening, all made possible by tearing down the Alaskan Way Viaduct.</p>
<p>The post <a href="https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/">Seattle Waterfront Park Project Finally Enters Its Home Stretch</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">After years of construction disrupting the entirety of Seattle&#8217;s waterfront, an end to jackhammering and a final grand opening is finally in sight, with the city&#8217;s powerbrokers ready to take full credit. On March 7, the Downtown Seattle Association [DSA] hosted its annual &#8220;State of Downtown&#8221; event and a major theme was the hotly anticipated grand opening of downtown&#8217;s new and improved waterfront park next spring. Backers expected the new park and aquarium to be a jolt to the local economy and a showpiece for the city.</p>



<p class="wp-block-paragraph">The speaker program included Joy Shigaki, CEO of Friends of Waterfront Seattle, and Leslie Koch, a donors&#8217; representative with <a href="https://www.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/" target="_blank" rel="noopener" title="">Elliott Bay Connections project</a>, a public-private partnership to extend park improvements farther to the north. Both talked up the transformative potential of the linear park, with the new Seattle Aquarium and the Overlook Walk connecting it to Pike Place Market expected to open next year. The new pedestrian connection will join the new <a href="https://www.theurbanist.org/2023/11/11/new-marion-street-pedestrian-bridge-caps-off-colman-dock-rebuild/" target="_blank" rel="noopener" title="Marion Street">Marion Street</a> overpass as a way to access the public spaces along the waterfront without dealing with the busy freight corridor that is Alaskan Way.</p>



<p class="wp-block-paragraph">&#8220;The Overlook Walk [is] the real sweet spot and a selfie spot that&#8217;s going to give you the experience of a 360-degree views, the same height as the viaduct, for those of you who are really missing those views driving during the morning,&#8221; Shigaki said. &#8220;People talk about that a lot.&#8221;</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects.jpg"><img fetchpriority="high" decoding="async" width="1024" height="731" data-attachment-id="166135" data-permalink="https://old.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/seattle-waterfront-with-overlook-walk-by-lmn-architects/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects.jpg" data-orig-size="1127,804" data-comments-opened="0" data-image-title="Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects" data-image-description="" data-image-caption="&lt;p&gt;Proposed waterfront connections with the new Overlook Walk. (City of Seattle)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-1024x731.jpg" src="https://www.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-1024x731.jpg" alt="" class="wp-image-166135" srcset="https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-1024x731.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-768x548.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-589x420.jpg 589w, https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-696x497.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects-100x70.jpg 100w, https://old.theurbanist.org/wp-content/uploads/2023/09/Seattle-Waterfront-with-Overlook-Walk-by-LMN-Architects.jpg 1127w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">This rendering of the waterfront connections with the new Overlook Walk, which will recreate the views from the top of the viaduct that some have been missing. (City of Seattle)</figcaption></figure>



<p class="wp-block-paragraph">Already elements of the new waterfront are coming online. A <a href="https://www.theurbanist.org/2023/01/12/waterfront-seattle-to-kick-off-2023-events-with-lunar-new-year/" target="_blank" rel="noopener" title="">new Pier 62 park</a> opened in 2020 and an <a href="https://www.theurbanist.org/2023/01/30/a-multimodal-hub-comes-together-at-colman-dock/" target="_blank" rel="noopener" title="">overhauled Colman Dock ferry terminal</a> and a next door <a href="https://www.theurbanist.org/2023/07/03/pioneer-square-habitat-beach-opens/" target="_blank" rel="noopener" title="">Pioneer Square Beach Habitat</a> opened last year. The new waterfront <a href="https://www.theurbanist.org/2022/03/20/surface-highway-undermines-seattles-waterfront-park/" target="_blank" rel="noopener" title="">Alaskan Way Boulevard</a> is also open as is a new four-lane Belltown connector called <a href="https://www.theurbanist.org/2023/04/27/seattle-prepares-to-open-brand-new-elliott-way-highway-connector/" target="_blank" rel="noopener" title="">Elliott Way</a> &#8212; the City gave the pairing of streets an honorary Lushootseed name of &#8220;<a href="https://waterfrontseattle.org/dzidzilalich" target="_blank" rel="noopener" title="">Dzidzilalich</a>.&#8221;</p>


<div class="wp-block-image">
<figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm.jpg"><img decoding="async" width="1024" height="768" data-attachment-id="177365" data-permalink="https://old.theurbanist.org/beach-habitat-park-by-colman-dock-with-seattle-skyline-by-trumm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1708709799&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Beach Habitat Park by Colman Dock with Seattle Skyline by Trumm" data-image-description="" data-image-caption="&lt;p&gt;The new habitat beach next to the Colman Dock ferry terminal is already getting a stead clip of beachgoers. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-1024x768.jpg" alt="" class="wp-image-177365" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Beach-Habitat-Park-by-Colman-Dock-with-Seattle-Skyline-by-Trumm.jpg 1280w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">The new Pioneer Square Habitat Beach next to the Colman Dock ferry terminal is already getting a steady clip of beachgoers. (Doug Trumm)</figcaption></figure>
</div>


<p class="wp-block-paragraph">The Friends of Waterfront Park has been heavily programming Pier 62, with activities like giant chess boards and mini soccer fields in place on most days, and fitness or dance classes and musical performances scheduled throughout the year. &#8220;Over a million people have come to Pier 62, and it has been a reminder of how parks can be transformative that they&#8217;re made for and they make for dynamic, democratic cities,&#8221; Shigaki said.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319.jpg"><img decoding="async" width="1024" height="768" data-attachment-id="177451" data-permalink="https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/pier-62-play-area-with-overlook-and-aquarium-construction-trumm-20240319/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1710872824&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-1024x768.jpg" alt="" class="wp-image-177451" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-play-area-with-overlook-and-aquarium-construction-Trumm-20240319.jpg 1280w" sizes="(max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">Pier 62&#8217;s play area was set up for mini soccer on March 19, but also has other set-ups like bean bag toss. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">It&#8217;s been a long road to get here. Shigaki thanked the crowd of dignitaries from leading downtown businesses and nonprofits for bearing with the decade plus of construction impacts that brought forth the park and associated infrastructure. Seattle&#8217;s new waterfront park was made possible by tearing down the <a href="https://www.theurbanist.org/2019/01/15/highway-viaducts-are-bad-and-seattle-is-better-without-one/" target="_blank" rel="noopener" title="">Alaskan Way Viaduct</a>, an elevated double-decker highway that carried roughly 100,000 cars per day at its peak. The way the region opted to accomplish this was to dig a nearly two-mile highway megatunnel underneath the city to <a href="https://www.theurbanist.org/2023/05/17/sr-99-tunnels-financial-outlook-remains-negative-despite-cash-infusion-traffic-uptick/" target="_blank" rel="noopener" title="">replace the bulk</a> of the viaduct&#8217;s highway capacity, which added to the construction time, especially after a three year delay to extract and repair a <a href="https://www.theurbanist.org/2017/04/06/bertha/" target="_blank" rel="noopener" title="">busted tunnel boring machine</a>, which had been the world&#8217;s largest.</p>


<div class="wp-block-image">
<figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="134367" data-permalink="https://old.theurbanist.org/2022/03/20/surface-highway-undermines-seattles-waterfront-park/seattle-waterfront-with-wide-alaskan-way-blvd-by-the-urbanist/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist.jpg" data-orig-size="2048,1536" data-comments-opened="0" data-image-title="Seattle Waterfront with wide Alaskan Way Blvd by The Urbanist" data-image-description="" data-image-caption="&lt;p&gt;Alaskan Way Boulevard will be nine lanes wide at its widest, disrupting the park-like atmosphere sought on the Seattle Waterfront. (The Urbanist)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-1024x768.jpg" alt="" class="wp-image-134367" srcset="https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-1536x1152.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2022/03/Seattle-Waterfront-with-wide-Alaskan-Way-Blvd-by-The-Urbanist.jpg 2048w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">Alaskan Way Boulevard will be nine lanes wide at its widest, disrupting the park-like atmosphere sought on the Seattle Waterfront. (The Urbanist)</figcaption></figure>
</div>


<p class="wp-block-paragraph">&#8220;Nationally, we&#8217;re seeing this trend of reclaiming old infrastructure projects, highways, double-decker highways, railroads, to be able to reclaim the beauty of our cities from what they once were,&#8221; Shigaki said. &#8220;And Waterfront Park is going to be part of that renewal, but it&#8217;s going to be part of the revitalization and part of creating a place that everyone sees themselves in and memories to be created.&#8221;</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="177456" data-permalink="https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/overlook-walk-construciton-over-elliott-way-trumm-20240319/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1710872195&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Overlook-Walk-construction over Elliott Way-Trumm-20240319" data-image-description="" data-image-caption="&lt;p&gt;The Overlook Walk helps funnel foot traffic over Elliott Way, which is a fairly car focused four lane road. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-1024x768.jpg" alt="An overpass over a four lane road. No plantings yet, but will be added later." class="wp-image-177456" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Overlook-Walk-construciton-over-Elliott-Way-Trumm-20240319.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">The Overlook Walk helps funnel foot traffic over Elliott Way, which is a fairly car-focused four-lane road. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">While local urbanist leaders like <a href="https://www.theurbanist.org/2018/02/07/conversation-cary-moon/" target="_blank" rel="noopener" title="">Cary Moon</a> and former Mayor <a href="https://www.officialhacksandwonks.com/blog/seattle-waterfront-sr99-tunnel-fight" target="_blank" rel="noopener" title="">Mike McGinn</a> argued the highway tunnel was not necessary and the focus should be on transit, pedestrian, and park improvements alone, ultimately highway tunnel boosters won out and have sought to frame the tunnel as <a href="https://www.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/" target="_blank" rel="noopener" title="">inevitable and necessary</a> for the park plans since. Of course, Moon, McGinn, and the larger <a href="https://www.historylink.org/File/22670" target="_blank" rel="noopener" title="">People&#8217;s Waterfront Coalition</a> movement against the downtown highway in either an elevated or buried form received no mention at the event.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="177362" data-permalink="https://old.theurbanist.org/seattle-waterfront-with-alaskan-way-viaduct-by-trumm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1551615463&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Seattle waterfront with Alaskan Way Viaduct by Trumm" data-image-description="" data-image-caption="&lt;p&gt;Alaskan Way Viaduct was an eye sore and a major source of pollution, but it came down in 2019. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-1024x768.jpg" alt="Two levels of elevated highway rise above a surface road below in a concrete monstrosity, obscuring the bottom half of the downtown Seattle skyline from the waterfront." class="wp-image-177362" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-waterfront-with-Alaskan-Way-Viaduct-by-Trumm.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">Alaskan Way Viaduct was an eye sore and a major source of pollution, but it came down in 2019. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">&#8220;This extraordinary, double-decker highway cut across the most beautiful part of our city, like the Embarcadero in San Francisco, like other cities across the nation,&#8221; Shigaki said. &#8220;It was not about human-centered design. It was about disconnection. But the audacity of the vision after the 2001 Nisqually earthquake, the conversations even before that was what happens when you build a new tunnel.&#8221;</p>



<p class="wp-block-paragraph">Before the viaduct replacement project, the hulking highway polluted downtown with noise and air pollution and interrupted the flow of people from downtown to the waterfront. Now downtown finds itself relatively unobstructed and connected to its unique Elliott Bay waterfront &#8212; though the overbuilt Alaskan Way roadway, eight lanes near Colman Dock, isn&#8217;t the most welcoming sight to visitors arriving at downtown&#8217;s south end.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="177364" data-permalink="https://old.theurbanist.org/waterfront-path-near-ferry-terminal-with-seatings-by-trumm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1708710412&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Waterfront path near ferry terminal with seatings by Trumm" data-image-description="" data-image-caption="&lt;p&gt;With the waterfront already springing to life with pedestrians, the viaduct removal and park expansion already constitute a big makeover for Downtown Seattle. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-1024x768.jpg" alt="" class="wp-image-177364" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Waterfront-path-near-ferry-terminal-with-seatings-by-Trumm.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">With the waterfront already springing to life with pedestrians, the viaduct removal and park expansion already constitute a big makeover for Downtown Seattle. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">&#8220;Tear it down to reveal what is possible about a new waterfront and a new park to be born,&#8221; Shigaki said. &#8220;It is a 20-acre park that is in the shadow of the former viaduct. So I&#8217;ve met people who actually moved in after the viaduct came down and said, &#8216;What&#8217;s the big deal?&#8217; Like you don&#8217;t remember. So part of the storytelling of this place is retelling that story, right? What it took to get here to take that double-decker highway down the political leadership residents advocates, this 20-acre park running from the stadium district all the way to Belltown will be creating this dynamic tapestry of experience of public space, connection to the waterfront, the tendrils back down to Pioneer Square, the 20-block <a href="https://www.theurbanist.org/2021/07/30/pike-pine-renaissance-further-watered-down-in-latest-plans/" title="">Pike-Pine extension</a> to Capitol Hill and down back to Pike Place Market is part of that vision of reclaiming this extraordinary space. There&#8217;s massive economic impact&#8230;&#8221;</p>



<p class="wp-block-paragraph">Collectively, all the projects associated with the new waterfront account for more than $1.1 billion in construction work and 6,200 jobs overall, Shigaki said.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="166161" data-permalink="https://old.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/alaskan-way-construction-at-pier-62-by-doug-trumm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1684958301&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm" data-image-description="" data-image-caption="&lt;p&gt;In May, SDOT was working on repaving Alaskan Way with two travel lanes each way even though traffic demand is light west of the new Elliott Way highway bypass. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-1024x768.jpg" alt="" class="wp-image-166161" srcset="https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2023/09/Alaskan-Way-construction-at-PIer-62-by-Doug-Trumm.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">In May, SDOT was working on repaving Alaskan Way with two travel lanes each way even though traffic demand is light west of the new Elliott Way highway bypass. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">The 2001 earthquake damaged the viaduct, which dated to 1953, kicking off a chain of events that lasted over a decade but ultimately led to approval of a four-billion-dollar SR 99 tunnel and a billion-dollar new waterfront. The level of investment is impressive, and in fact the park project, which relied on a public-private partnership, is still shoring up its finances to finish off the remaining 12% of its fundraising campaign. Shigaki made a pitch for the companies and wealthy individuals in the room to chip in.</p>



<p class="wp-block-paragraph">&#8220;We are wrapping up the campaign, Waterfront Park, which is a $170 million effort, and we raised 88% of that goal, which is extraordinary, and we&#8217;re in the last stretch to get there,&#8221; Shigaki said. &#8220;So it&#8217;s a real indication to all of you to join us to close this chapter of this campaign and move into how a waterfront park is going to be part of this town in this ecosystem.&#8221;</p>



<p class="wp-block-paragraph">With an eye to the topic du jour, especially in corporate circles, Friends of Waterfront Seattle stressed the safety improvements being paired with the projects. Unlike most park spaces downtown that are operated by Seattle Parks and Recreation, Waterfront Park has been operated since last year by the City&#8217;s Seattle Center department, with former Waterfront Seattle director Marshall Foster at the helm &#8212; in partnership with Friends of Waterfront Seattle.</p>


<div class="wp-block-image">
<figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="177367" data-permalink="https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/pier-62-looking-out-to-sea-near-sunset-trumm-20230524/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1684958146&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Pier 62 looking out to sea near sunset Trumm 20230524" data-image-description="" data-image-caption="&lt;p&gt;Pier 62 has programming like bean bag toss and patio seating in hopes of enticing people to stick around and keep a family friendly atmosphere. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-1024x768.jpg" alt="" class="wp-image-177367" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Pier-62-looking-out-to-sea-near-sunset-Trumm-20230524.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">Pier 62 has programming like bean bag toss and patio seating in hopes of enticing people to stick around and keep a family friendly atmosphere. (Doug Trumm)</figcaption></figure>
</div>


<p class="wp-block-paragraph">&#8220;We&#8217;re making public safety investments we&#8217;ve invested $3 million to date on Pier 62 alone modeling a new model for public safety that&#8217;s centered in a humane approach, as [DSA President] Jon [Scholes] talked about, we&#8217;re working with <a href="https://www.evergreentreatment.org/about-reach/" target="_blank" rel="noopener" title="">Project Reach</a> to provide outreach workers for those who are on housed our staff are the eyes and ears on the park,&#8221; Shigaki said. &#8220;And a new partnership with Seattle Center is providing public safety officers to be able to be available to address issues to be able to work and enforce Park rules. And then you call the Seattle Police Department when it&#8217;s needed. But that unique approach is what we need to solve for some of these more challenging issues.&#8221;</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="177454" data-permalink="https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/seattle-aquarium-construction-trumm-20240319/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319.jpg" data-orig-size="1280,960" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1710872327&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Seattle-Aquarium-construction-Trumm-20240319" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-1024x768.jpg" alt="" class="wp-image-177454" srcset="https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2024/03/Seattle-Aquarium-construction-Trumm-20240319.jpg 1280w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">The new Seattle Aquarium expands from the neighboring aquarium facility and is starting to take shape. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">Taking a trip down the annals of Seattle history, Koch pointed to the foundational vision of the Olmsted brothers, the acclaimed landscape architects that designed many of Seattle&#8217;s major parks and parkways (ditto for most other major American cities). In 1903 a group of civil leaders wanted to make Seattle a beautiful city, she noted, &#8220;And they hired the Olmsted brothers. And as we all know, pick a park: Seward Park, Woodland Park, what would Seattle be without the Olmsted designed parks, and the Olmsteds really recognized what makes Seattle unique and gorgeous&#8230; 120 years ago, [they said] the primary aim should be to secure and preserve for the use of the people as much as possible in these advantages of water and mountain views.&#8221;</p>



<p class="wp-block-paragraph">The Olmsteds&#8217; vision included a world-class waterfront park for downtown, which has gone unrealized until now. Partially this is due to the lack of major parcel of open space in any prominent section, and also because the connections to the surrounding areas were relatively weak and short on pedestrian friendliness. 1974&#8217;s Waterfront Park, funded by the <a href="https://www.theurbanist.org/2018/05/02/forward-thrust-part-1-no-city-island/" target="_blank" rel="noopener" title="">Forward Thrust ballot measure</a> six years earlier, was the first major public park along the waterfront, a park that the waterfront redevelopment is completely rebuilding.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1.jpg"><img loading="lazy" decoding="async" width="1024" height="384" data-attachment-id="166133" data-permalink="https://old.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/elliott-bay-connections-ebcimage1_map-1536x576-1/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1.jpg" data-orig-size="1536,576" data-comments-opened="0" data-image-title="Elliott-Bay-Connections-EBCImage1_Map-1536&amp;#215;576-1" data-image-description="" data-image-caption="&lt;p&gt;The Elliott Bay Connections stretches from Pier 62 (the northern end of Waterfront Park) to the beach just south of Smith Cove. (Elliott Bay Connections)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1-1024x384.jpg" src="https://www.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1-1024x384.jpg" alt="A satellite map of the Seattle waterfront shows the project area." class="wp-image-166133" srcset="https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1-1024x384.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1-768x288.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1-1120x420.jpg 1120w, https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1-696x261.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2023/09/Elliott-Bay-Connections-EBCImage1_Map-1536x576-1.jpg 1536w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">The Elliott Bay Connections stretches from Pier 62 (the northern end of Waterfront Park) to the beach just south of Smith Cove. (Elliott Bay Connections)</figcaption></figure>



<p class="wp-block-paragraph">The <a href="https://www.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/" target="_blank" rel="noopener" title="">Elliott Bay Connections effort</a> aims to address that with an infusion of $45 million in philanthropist donations to improve the trail from Interbay all the way to Pier 62 and add more plantings and amenities in Centennial Park and Myrtle Edwards Park, which composes the waterfront through the Queen Anne foothill sections. The plan calls for replacing old waterfront streetcar tracks with a landscaped multi-use trail to help handle the expected walking, rolling, and biking traffic and beautify the street. Those improvements are promised by 2026, in time for the World Cup soccer matches that Seattle will be hosting.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="166155" data-permalink="https://old.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/skateborder-and-pedestrians-at-myrtle-edwards-park-sunset-by-doug-trumm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm.jpg" data-orig-size="1600,1200" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1632509694&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm" data-image-description="" data-image-caption="&lt;p&gt;Myrtle Edwards Park gets a lot of use on a sunny day. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-1024x768.jpg" alt="The sun sets in shades of orange over the Olympic Mountains. A wide-canopied tree and a skateboarder are in the foreground and a line of people walking along the waterfront path are in the background." class="wp-image-166155" srcset="https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-1536x1152.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2023/09/Skateborder-and-pedestrians-at-Myrtle-Edwards-Park-sunset-by-Doug-Trumm.jpg 1600w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption class="wp-element-caption">Myrtle Edwards Park gets a lot of use on a sunny day. (Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">&#8220;What people don&#8217;t recognize, perhaps, is that the Olmsted brothers also had a vision for a waterfront park on the other side of the lake on Elliott Bay that was never realized. So when we think about the inspiration and vision for reclaiming the waterfront for all of us, it actually goes back that long, and then as we looked ahead from 1903, there were many generations of civic activists in this community who advocated for the removal of the viaduct, and taking the waterfront back for the people.&#8221;</p>



<p class="wp-block-paragraph">The Olmsted vision will take another big step forward in 2025, and Seattle will be better for it.</p>



<figure class="wp-block-embed is-type-wp-embed is-provider-the-urbanist wp-block-embed-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="24r3iAMSmd"><a href="https://www.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/">Seattle Waterfront Park Makeover Promises New Greenway and Public Fishing</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Seattle Waterfront Park Makeover Promises New Greenway and Public Fishing&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2023/09/30/seattle-waterfront-park-makeover-promises-new-greenway-native-plants-and-public-fishing/embed/#?secret=U9LTzIR1JW#?secret=24r3iAMSmd" data-secret="24r3iAMSmd" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure>



<figure class="wp-block-embed is-type-wp-embed is-provider-the-urbanist wp-block-embed-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="pvWjrAEpRm"><a href="https://www.theurbanist.org/2022/03/20/surface-highway-undermines-seattles-waterfront-park/">Surface Highway Undermines Seattle&#8217;s Waterfront Park</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Surface Highway Undermines Seattle&#8217;s Waterfront Park&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2022/03/20/surface-highway-undermines-seattles-waterfront-park/embed/#?secret=8p7LRLazcY#?secret=pvWjrAEpRm" data-secret="pvWjrAEpRm" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure><p>The post <a href="https://old.theurbanist.org/2024/03/20/waterfront-seattle-project-finally-enters-its-home-stretch/">Seattle Waterfront Park Project Finally Enters Its Home Stretch</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">177171</post-id>	</item>
		<item>
		<title>SR 99 Tunnel is Bleeding Money as Toll Revenue Forecasts Plunge</title>
		<link>https://old.theurbanist.org/2022/07/22/sr-99-tunnel-is-bleeding-money-as-toll-revenue-forecasts-plunge/</link>
		
		<dc:creator><![CDATA[Ryan Packer]]></dc:creator>
		<pubDate>Fri, 22 Jul 2022 14:45:26 +0000</pubDate>
				<category><![CDATA[Driving]]></category>
		<category><![CDATA[Features]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=141104</guid>

					<description><![CDATA[<p>The state treasurer&#8217;s office brought some bad news to the Washington Transportation Commission this week regarding the revenue forecast for the Washington State Department of Transportation (WSDOT) SR 99 tunnel underneath downtown Seattle. Given current trends, the financial models predict that the SR 99 tunnel won&#8217;t be able to financially sustain itself in the near [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2022/07/22/sr-99-tunnel-is-bleeding-money-as-toll-revenue-forecasts-plunge/">SR 99 Tunnel is Bleeding Money as Toll Revenue Forecasts Plunge</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">The state treasurer&#8217;s office brought some bad news to the Washington Transportation Commission this week regarding the revenue forecast for the Washington State Department of Transportation (WSDOT) SR 99 tunnel underneath downtown Seattle. Given current trends, the financial models predict that the SR 99 tunnel won&#8217;t be able to financially sustain itself in the near term, and that trend isn&#8217;t expected to reverse itself over the long term. &#8220;We&#8217;re seeing a permanent reduction in revenues that ranges from 16% on out to over 30% [from year to year],&#8221; Jason Richter, the state&#8217;s Deputy Treasurer for Debt Management, told the commission that sets the state&#8217;s toll rates.</p>



<p class="wp-block-paragraph">Richter didn&#8217;t sugar coat the outlook for the toll facility remaining in the black. &#8220;I think it&#8217;s important to note that there&#8217;s been a permanent shift in the projected use of this corridor, which is going to have a pretty substantial negative impact on our revenues over the projection period&#8221; which extends to 2052, he said. &#8220;We&#8217;ve just got a sea of red&#8230;we&#8217;ve got insufficient revenues in every year during the projection period essentially, and a lot of them are pretty substantial.&#8221; He provided the commission a balance sheet that by 2052 showed a cumulative negative balance of $236 million dollars.</p>



<p class="wp-block-paragraph">&#8220;There&#8217;s going to need to be some additional toll increases, but I&#8217;m suspicious that that&#8217;s not going to be sufficient to cover the entirety of this issue, given that the shortfall in a lot of years is equal to roughly a third of the revenue coming in,&#8221; he said. &#8220;There&#8217;s likely going to be a need for some legislative assistance on this&#8230;all of the potential actions will be needed to remedy this particular problem.&#8221; Raising toll rates to make up for declining revenues is a standard practice, but it can&#8217;t work if those toll increases drive people away, and the SR 99 is a route that&#8217;s pretty easy to avoid for a lot of people.</p>



<p class="wp-block-paragraph">Overall traffic volumes in the SR 99 tunnel are not looking good compared to the forecasts that WSDOT prepared over a decade ago as part of the environmental review for the Alaskan Way Viaduct <a href="https://www.theurbanist.org/2019/01/25/the-viaduct-is-dead-will-waterfront-seattle-live/" data-type="post" data-id="63351" target="_blank" rel="noreferrer noopener">replacement program</a>. That documentation projected that with tolling in place, by 2030 over 57,000 vehicles per day would use the facility, a substantial decline compared to the number that would use it if it weren&#8217;t tolled. </p>



<p class="wp-block-paragraph">That 2030 forecast is lower than the actual volumes the highway saw in 2019, before tolling was implemented and prior to the impact of the pandemic on traffic volumes. But now traffic volumes are well below 40,000 per day: numbers from last year show slightly more than 32,000 vehicles per day, and WSDOT&#8217;s <a href="https://wsdot.wa.gov/about/covid-19-transportation-report/" target="_blank" rel="noreferrer noopener">volume dashboard</a> shows that volumes on the corridor have been consistently 30-40% below their pre-pandemic levels even as other state highways are essentially back to pre-pandemic traffic volumes.</p>


<div class="wp-block-image">
<figure class="aligncenter size-full"><a href="https://www.theurbanist.org/wp-content/uploads/2022/07/image-26.png"><img loading="lazy" decoding="async" width="890" height="553" data-attachment-id="141171" data-permalink="https://old.theurbanist.org/2022/07/22/sr-99-tunnel-is-bleeding-money-as-toll-revenue-forecasts-plunge/image-26-5/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/07/image-26.png" data-orig-size="890,553" data-comments-opened="0" data-image-title="image-26" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/07/image-26.png" src="https://www.theurbanist.org/wp-content/uploads/2022/07/image-26.png" alt="Bar chart showing high volumes in 2019 but low in 2021 compared to the 2030 forecasts" class="wp-image-141171" srcset="https://old.theurbanist.org/wp-content/uploads/2022/07/image-26.png 890w, https://old.theurbanist.org/wp-content/uploads/2022/07/image-26-768x477.png 768w, https://old.theurbanist.org/wp-content/uploads/2022/07/image-26-676x420.png 676w, https://old.theurbanist.org/wp-content/uploads/2022/07/image-26-696x432.png 696w, https://old.theurbanist.org/wp-content/uploads/2022/07/image-26-356x220.png 356w" sizes="auto, (max-width: 890px) 100vw, 890px" /></a><figcaption>Daily traffic volumes in the SR 99 tunnel are substantially lower than they&#8217;re projected to be in 2030 even with much higher tolls on the facility, suggesting problems ahead for the overall toll program. </figcaption></figure>
</div>


<p class="wp-block-paragraph">But that 2030 forecast comes with a big caveat: it assumed much higher tolls than are currently in place. Southbound PM peak tolls of $5.00 in 2015 dollars, or $6.25 today, were used to project those volumes. With a Good To Go pass, the highest tolls get today is $2.70. Raising tolls would likely push additional users out of the tunnel, not helping the revenue spiral.</p>



<p class="wp-block-paragraph">Between 2019 and 2022, the legislature loaned the SR 99 toll program several million dollars to keep the program stable following the dip in traffic volumes during the pandemic. But payments on the debt issued to pay for the tunnel and costs to operate and maintain the tunnel are gobbling up a larger and larger share of the projected revenues generated from tolling. In 2020, with the substantial decline in usage of the tunnel, the program did not have enough revenue to cover costs; that&#8217;s projected to also be true in 2022. And those loans from the legislature will ultimately be repaid, of which Richter said &#8220;there&#8217;s not a solid plan in place for when that&#8217;s to be.&#8221;</p>



<p class="wp-block-paragraph">This year, the legislature contemplated spending nearly three-quarters of a billion dollars removing all tolls from the Tacoma Narrows Bridge, where toll revenues had been assumed to pay for an abnormally high share of the overall project when it was built. Ultimately, a much less dramatic <a rel="noreferrer noopener" href="https://www.theurbanist.org/2022/02/14/democrats-change-gears-on-plan-to-reduce-tolls-on-the-tacoma-narrows-bridge/" target="_blank">fix was passed</a> that is intended to lower toll rates quite modestly. But the entire episode illustrates just how volatile WSDOT&#8217;s tolled corridors, most of which are used by the state as revenue generators and not demand management tools, are. The Tacoma Narrows Bridge, which has few alternatives, has essentially fully recovered from its pandemic volume lull and that associated revenue hit. Things don&#8217;t look anywhere near as rosy for SR 99.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="131618" data-permalink="https://old.theurbanist.org/99tunnelportalinslu/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU.jpg" data-orig-size="1600,1200" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1643214373&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="99TunnelPortalinSLU" data-image-description="" data-image-caption="&lt;p&gt;The north portal to the SR 99 tunnel with a toll rate display. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1024x768.jpg" alt="" class="wp-image-131618" srcset="https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1536x1152.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU.jpg 1600w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>The north portal of the SR 99 tunnel with a toll rate display. (Photo by Doug Trumm)</figcaption></figure>



<p class="wp-block-paragraph">In addition to the latest forecast, the long-term traffic volume trends in the SR 99 tunnel could be even less stable than they appear now. Within a year, the new <a href="https://www.theurbanist.org/2020/11/09/seattles-newest-street-on-the-waterfront-takes-shape/" data-type="post" data-id="99184" target="_blank" rel="noreferrer noopener">Elliott Way</a> roadway will open, providing a new direct route between the 15th Ave W corridor through Ballard and the waterfront, creating an attractive alternative for a lot of drivers who may currently be using the tunnel. Of course, the 99 tunnel always becomes more attractive when alternate routes become congested, which may happen over time.</p>



<p class="wp-block-paragraph">Contacted about the new dire revenue forecast, WSDOT spokesperson Christopher Foster didn&#8217;t provide much additional information. &#8220;The traffic and revenue information shared at [Wednesday&#8217;s] Washington State Transportation Commission (WSTC) meeting is based on current traffic and revenue forecasts. These forecasts are updated on a quarterly basis and are subject to further changes. We’ll continue to work with our partners at the Washington State Transportation Commission and the Office of the State Treasurer (OST) to evaluate the pandemic’s effect on traffic in the SR 99 tunnel, and strategies for meeting financial needs for the facility,&#8221; he said. </p>



<p class="wp-block-paragraph">Setting the SR 99 toll program up to pay back the bonds that were issued to pay for the tunnel itself may not be that uncommon of a practice for transportation departments, but it is the exactly sort of thing that tunnel skeptics were raising alarms about back when the future of the Alaskan Way Viaduct was being debated. In 2009, Mayoral candidate Mike McGinn raised concerns about Seattle residents being on the hook for any cost overruns from the project, concerns he brought into the Mayor&#8217;s office when elected even as he ultimately proved unable to stop the project. Now, shortfalls in the tolling program could ultimately end up making all Washington residents pay, if the tunnel needs a bailout.</p>



<figure class="wp-block-embed is-type-wp-embed is-provider-the-urbanist wp-block-embed-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="H1dX2FsBZA"><a href="https://www.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/">Seattle Squeeze 2.0? SR-99 Tolling Could Divert Traffic to City Streets</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Seattle Squeeze 2.0? SR-99 Tolling Could Divert Traffic to City Streets&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/embed/#?secret=CWVSThNXIF#?secret=H1dX2FsBZA" data-secret="H1dX2FsBZA" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure>



<figure class="wp-block-embed is-type-wp-embed is-provider-the-urbanist wp-block-embed-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="jIc1dtufCC"><a href="https://www.theurbanist.org/2022/02/04/sr-99-tunnel-threatens-south-lake-unions-light-rail-future/">SR-99 Tunnel Threatens South Lake Union&#8217;s Light Rail Future</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;SR-99 Tunnel Threatens South Lake Union&#8217;s Light Rail Future&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2022/02/04/sr-99-tunnel-threatens-south-lake-unions-light-rail-future/embed/#?secret=NCUeJONsN6#?secret=jIc1dtufCC" data-secret="jIc1dtufCC" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure><p>The post <a href="https://old.theurbanist.org/2022/07/22/sr-99-tunnel-is-bleeding-money-as-toll-revenue-forecasts-plunge/">SR 99 Tunnel is Bleeding Money as Toll Revenue Forecasts Plunge</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">141104</post-id>	</item>
		<item>
		<title>SR-99 Tunnel Threatens South Lake Union&#8217;s Light Rail Future</title>
		<link>https://old.theurbanist.org/2022/02/04/sr-99-tunnel-threatens-south-lake-unions-light-rail-future/</link>
		
		<dc:creator><![CDATA[Doug Trumm]]></dc:creator>
		<pubDate>Fri, 04 Feb 2022 15:00:00 +0000</pubDate>
				<category><![CDATA[Features]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[Link light rail]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<category><![CDATA[Transit]]></category>
		<category><![CDATA[Transportation]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=131581</guid>

					<description><![CDATA[<p>Boosters of the SR-99 tunnel replacing the Alaskan Way Viaduct promised transit improvements to Seattle voters, hoping to win their favor. It turns out, however, the opposite was true. No King County Metro buses use the tunnel, even three years after its opening, and now the tunnel is complicating plans for a second light rail [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2022/02/04/sr-99-tunnel-threatens-south-lake-unions-light-rail-future/">SR-99 Tunnel Threatens South Lake Union’s Light Rail Future</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">Boosters of the SR-99 tunnel replacing the Alaskan Way Viaduct promised transit improvements to Seattle voters, hoping to win their favor. It turns out, however, the opposite was true. No King County Metro buses use the tunnel, even three years after <a rel="noreferrer noopener" href="https://www.theurbanist.org/2019/01/25/the-viaduct-is-dead-will-waterfront-seattle-live/" data-type="post" data-id="63351" target="_blank">its opening</a>, and now the tunnel is <a rel="noreferrer noopener" href="https://www.theurbanist.org/2022/01/14/deep-seattle-light-rail-stations-other-st3-details-emerging-ahead-of-january-28-draft-plan-release/" data-type="post" data-id="129922" target="_blank">complicating plans</a> for a second light rail tunnel through Downtown.</p>



<p class="wp-block-paragraph">Sound Transit&#8217;s preferred alternative would put an underground station at Harrison Street and SR-99. Since this location is right where SR-99 enters a tunnel, it means the light rail station has to be quite deep to clear the car tunnel &#8212; 120 feet deep in the agency&#8217;s plan. This depth could add nearly five minutes to a transit trip just in navigating the cavernous station and dealing with long escalators or elevators that could have significant queues at a station projected to get 10,500 daily boardings. It will also make the transit station more expensive to build for a transit agency already facing <a rel="noreferrer noopener" href="https://www.theurbanist.org/2021/01/08/sound-transit-reveals-big-jump-in-cost-estimates-for-ballard-and-west-seattle-link/" data-type="post" data-id="103200" target="_blank">major cost escalation issues</a>.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31.png"><img loading="lazy" decoding="async" width="1024" height="579" data-attachment-id="130032" data-permalink="https://old.theurbanist.org/2022-01-13-31/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31.png" data-orig-size="1423,804" data-comments-opened="0" data-image-title="SLU DT-1 station cross-section" data-image-description="" data-image-caption="&lt;p&gt;The preferred alternative for Harrison Street Station would be about 120 feet deep. The station entrances would be just south of the SR-99 tunnel portal. (Sound Transit)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31-1024x579.png" src="https://www.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31-1024x579.png" alt="" class="wp-image-130032" srcset="https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31-1024x579.png 1024w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31-768x434.png 768w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31-743x420.png 743w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31-696x393.png 696w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-31.png 1423w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>The preferred alternative for Harrison Street Station would be about 120 feet deep. The station entrances would be just south of the SR-99 tunnel portal. (Sound Transit)</figcaption></figure>



<p class="wp-block-paragraph">To add insult to injury, it also puts a station entrance right next to the car pollution venting out of the tunnel, including the four yellow tubes that vent out smoke in case of a fire in the tunnel &#8212; hardly a pleasant environment for riders accessing the long station escalators or 11-story deep elevators. Nor is it an ideal location for transit-oriented development. Who wants to live sandwiched next to a busy highway trench and a smokestack?</p>



<div class="wp-block-image"><figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="131615" data-permalink="https://old.theurbanist.org/tunnelsmokestackslu/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU.jpg" data-orig-size="1600,1200" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1643214363&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="tunnelsmokestackSLU" data-image-description="" data-image-caption="&lt;p&gt;Ventilation shafts for the SR-99 tunnel will disrupt transit-oriented development near South Lake Union Station, which could be located right next door. (Photo by Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-1024x768.jpg" alt="Four yellow tubes jut out of a two-story glass building on Harrison Street." class="wp-image-131615" srcset="https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-1536x1152.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2022/02/tunnelsmokestackSLU.jpg 1600w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>Ventilation shafts for the SR-99 tunnel will disrupt transit-oriented development near South Lake Union Station, which could be located right next door. (Photo by author)</figcaption></figure></div>



<p class="wp-block-paragraph">As co-founder of the People&#8217;s Waterfront Coalition, <a rel="noreferrer noopener" href="https://www.theurbanist.org/2017/11/06/reasons-voting-cary-moon/" data-type="post" data-id="46977" target="_blank">Cary Moon</a> pushed the Washington State Department of Transportation (WSDOT) to abandon its tunnel plan and <a href="https://grist.org/article/seattles-difficult-decision-cary-moon/" target="_blank" rel="noreferrer noopener">support </a>surface transit alternative instead. Unfortunately, WSDOT and other tunnel boosters were relentless and eventually <a rel="noreferrer noopener" href="https://usa.streetsblog.org/2011/08/17/how-seattle%E2%80%99s-deep-bore-highway-opponents-lost-their-own-referendum/" target="_blank">forced through</a> the controversial project despite the fierce opposition from transit advocates and Seattle Mayor Mike McGinn. The tunnel failed a public advisory vote in 2007, but tunnel boosters kept pushing and spinning the project.</p>



<h2 class="wp-block-heading" id="false-transit-promises-from-highway-tunnel-boosters">False transit promises from highway tunnel boosters</h2>



<p class="wp-block-paragraph">The promise of transit upgrades from highway tunnel boosters, who branded their campaign as &#8220;tunnel plus transit,&#8221; was intended to outmaneuver and undercut the surface transit alternative that tunnel opponents were pushing. &#8220;What does this &#8216;surface option&#8217; mean for you? More traffic, more delay, buses and freight caught in gridlock,&#8221; the pro-tunnel crowd wrote in their <a rel="noreferrer noopener" href="https://www.tunneltalk.com/Discussion-Forum-Aug11-Alaskan-Way-bored-tunnel-a-story-of-political-interventions.php" target="_blank">2011 referendum statement</a>. Why back the surface transit alternative when boosters promised Seattle could have a highway tunnel and transit upgrades too? </p>



<p class="wp-block-paragraph">Unfortunately for riders, the tunnel&#8217;s transit plan was built on a hill of lies. Moon and advocates hit the nail on the head when it came to the transit implications, and she points out that the City should have seen this coming.</p>



<p class="wp-block-paragraph">&#8220;The City knew back in 2005, when the proposed monorail expansion project was killed, that we would need another approach for rapid grade separated transit to Ballard and West Seattle,&#8221; Moon said in a text. &#8220;We realized then we&#8217;d need another transit tunnel downtown.&#8221; </p>



<div class="wp-block-image"><figure class="aligncenter size-full"><a href="https://www.theurbanist.org/wp-content/uploads/2020/11/2020-11-22.png"><img loading="lazy" decoding="async" width="524" height="879" data-attachment-id="100291" data-permalink="https://old.theurbanist.org/2020/11/23/new-west-seattle-and-ballard-link-open-house/2020-11-22/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2020/11/2020-11-22.png" data-orig-size="524,879" data-comments-opened="1" data-image-title="Ballard and West Seattle Link station map" data-image-description="" data-image-caption="&lt;p&gt;This map shows the alignment and station options under consideration in the Draft EIS. (Sound Transit)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2020/11/2020-11-22.png" src="https://www.theurbanist.org/wp-content/uploads/2020/11/2020-11-22.png" alt="" class="wp-image-100291" srcset="https://old.theurbanist.org/wp-content/uploads/2020/11/2020-11-22.png 524w, https://old.theurbanist.org/wp-content/uploads/2020/11/2020-11-22-250x420.png 250w" sizes="auto, (max-width: 524px) 100vw, 524px" /></a><figcaption>This map shows the alignment and station options under consideration in the Draft EIS. (Credit: Sound Transit)</figcaption></figure></div>



<p class="wp-block-paragraph">The opportunity cost was enormous.</p>



<p class="wp-block-paragraph">&#8220;What if our region had prioritized Sound Transit as our future then instead of building WSDOT&#8217;s four-billion-dollar car tunnel?&#8221; Moon asked. &#8220;We wasted much time and money and precious underground terrain on perpetuating car culture. We could be choosing a shallower, lower cost, and more accessible second transit tunnel now if we hadn&#8217;t.&#8221;</p>



<div class="wp-block-image"><figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="64077" data-permalink="https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/insleeribboncutting/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting.jpg" data-orig-size="1200,900" data-comments-opened="1" data-image-title="InsleeRibbonCutting" data-image-description="" data-image-caption="&lt;p&gt;Governor Inslee holds the ribbon high outside the North Portal to the new SR-99 tunnel. (Credit: WSDOT)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-1024x768.jpg" alt="" class="wp-image-64077" srcset="https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting.jpg 1200w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>Governor Inslee holds the ribbon high outside the North Portal to the new SR-99 tunnel. Former Governor Chris Gregoire, former House Transportation Chair Steve Hobbs, and King County Executive Dow Constantine also make an appearance. (Credit: WSDOT)</figcaption></figure></div>



<p class="wp-block-paragraph">The issue of the tunnel has been a wedge in Seattle politics for more than a decade. During his administration from 2009 to 2013, McGinn fought to block the tunnel, but was defeated in his reelection bid by <a rel="noreferrer noopener" href="https://www.theurbanist.org/2017/09/13/murray-resigns-arena-mou/" target="_blank">Ed Murray</a>, a major tunnel supporter with robust backing from both the corporate and state Democratic party establishment, who also backed the tunnel. Cary Moon ran against Murray&#8217;s successor, Jenny Durkan, and she again took up the cause of transit, climate action, and safe streets for people walking, rolling, and biking over car-focused megaprojects, earning <a href="https://www.theurbanist.org/2017/10/19/2017-general-election-endorsements/" data-type="post" data-id="46466" target="_blank" rel="noreferrer noopener">The Urbanist Elections Committee&#8217;s endorsement</a>. But Durkan rode a wave of establishment support and bludgeoned her opponent on the issue of homelessness, including hitting her for suggesting the City <a rel="noreferrer noopener" href="https://www.theurbanist.org/2017/11/06/reasons-voting-cary-moon/" data-type="post" data-id="46977" target="_blank">should build shelter</a> for every homeless person in its borders &#8212; a position pretty similar to that held by Durkan&#8217;s successor <a rel="noreferrer noopener" href="https://www.theurbanist.org/2022/01/04/harrell-pledges-bold-agenda-in-inaugural-speech/" data-type="post" data-id="129117" target="_blank">Mayor Bruce Harrell</a>. Harrell, another highway tunnel supporter, now seeks to address a homelessness crisis that <a rel="noreferrer noopener" href="https://www.theurbanist.org/2021/12/31/durkan-leaves-behind-a-mess-after-four-rudderless-years/" data-type="post" data-id="128618" target="_blank">worsened under Durkan&#8217;s watch</a> despite her <a rel="noreferrer noopener" href="https://www.theurbanist.org/2021/03/02/durkan-is-botching-homelessness-policy-and-blaming-journalists-for-the-news/" data-type="post" data-id="107028" target="_blank">campaign pledges to address it.</a></p>



<div class="wp-block-image"><figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966.jpg"><img loading="lazy" decoding="async" width="1024" height="683" data-attachment-id="63770" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/tunnel_tour_32198662966/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-scaled.jpg" data-orig-size="2560,1707" data-comments-opened="1" data-image-meta="{&quot;aperture&quot;:&quot;4&quot;,&quot;camera&quot;:&quot;Canon EOS REBEL T3i&quot;,&quot;created_timestamp&quot;:&quot;1483515702&quot;,&quot;focal_length&quot;:&quot;17&quot;,&quot;iso&quot;:&quot;1250&quot;,&quot;shutter_speed&quot;:&quot;0.033333333333333&quot;}" data-image-title="Tunnel_Tour_(32198662966)" data-image-description="" data-image-caption="&lt;p&gt;Seattle City Council members tour the SR 99 tunnel. (Seattle City Council)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1024x683.jpg" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1024x683.jpg" alt="" class="wp-image-63770" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1024x683.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-768x512.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1536x1024.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-2048x1365.jpg 2048w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-630x420.jpg 630w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-696x464.jpg 696w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>Seattle City Council members tour the SR-99 tunnel. (Credit: Seattle City Council)</figcaption></figure></div>



<p class="wp-block-paragraph">Governor Jay Inslee called the highway tunnel the &#8220;eighth wonder of the world&#8221; at its <a rel="noreferrer noopener" href="https://www.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/" data-type="post" data-id="64058" target="_blank">ribbon-cutting</a> ceremony back in 2019 &#8212; three years later than promised after the world&#8217;s largest tunnel boring machine <a href="https://www.theurbanist.org/2014/06/17/wsdots-repair-plan-for-bertha/" data-type="post" data-id="12529" target="_blank" rel="noreferrer noopener">broke down</a> trying to chew through 1,000 feet of sloppy Seattle soil. The project&#8217;s cost overruns were significant even before toll revenue came in far <a rel="noreferrer noopener" href="https://www.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/" data-type="post" data-id="77664" target="_blank">under projections</a> due to WSDOT&#8217;s unrealistic and exaggerated traffic modeling &#8212; a <a rel="noreferrer noopener" href="https://www.theurbanist.org/2021/05/13/we-need-a-holistic-traffic-model-that-actually-works-for-our-goals/" data-type="post" data-id="111267" target="_blank">persistent problem</a> for the agency and the industry. Now, this gift that keeps on giving is driving up Sound Transit 3 costs and worsening future outcomes for riders.</p>



<p class="wp-block-paragraph">&#8220;They told us they were burying the highway through the city, but in fact what they were doing is burying it for part of the city and putting a lot of car infrastructure right into the middle of the city right there in South Lake Union,&#8221; McGinn said in an interview. &#8220;All of the infrastructure to move cars fast through the neighborhood are inconsistent with what we need to move people in transit in and out of the neighborhood.&#8221;</p>



<p class="wp-block-paragraph">The lack of bus lanes and traffic-clogged bus weave to exit Aurora Avenue is one legacy of that planning mistake, as is the difficulty in moving the bus stop to be next to Sound Transit&#8217;s planned light rail station. Like Moon, former Mayor McGinn said the looming issues were obvious.</p>



<p class="wp-block-paragraph">&#8220;We knew that from the start. It&#8217;s just that the highway builders really wanted their highway and they didn&#8217;t really care that much about the transit users,&#8221; McGinn said. &#8220;A big highway interchange in the middle of a city is bad urban design. It doesn&#8217;t take any particular genius from the planners to see that.&#8221;</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="131618" data-permalink="https://old.theurbanist.org/99tunnelportalinslu/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU.jpg" data-orig-size="1600,1200" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1643214373&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="99TunnelPortalinSLU" data-image-description="" data-image-caption="&lt;p&gt;The north portal to the SR 99 tunnel with a toll rate display. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1024x768.jpg" alt="" class="wp-image-131618" srcset="https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-1536x1152.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2022/02/99TunnelPortalinSLU.jpg 1600w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a></figure>



<p class="wp-block-paragraph">To McGinn, it all goes back to a flawed philosophy undergirding the deluxe underground highway bypass of Downtown Seattle.</p>



<p class="wp-block-paragraph">&#8220;Why did we build something to skip Seattle instead of to make Seattle better?&#8221; McGinn lamented. &#8220;The thing about a nice fine-grained street grid is that it supports so many things. It supports buses. It supports walking. It support biking. It supports small local businesses. It can support housing,&#8221; McGinn said. &#8220;That big [tunnel] portal, what does that support? It supports people who want to miss, in my opinion, the best part of whole damn state and Pacific Northwest. To skip Seattle.&#8221;</p>



<h2 class="wp-block-heading" id="mercer-station-alternative-also-ruined-by-car-tunnel">Mercer station alternative also ruined by car tunnel</h2>



<p class="wp-block-paragraph">Unfortunately, the only alternative that Sound Transit is still officially considering was also sabotaged by the highway tunnel project. The other option puts the station at Mercer Street and Aurora Avenue; on the plus side, since it&#8217;s north of the tunnel it&#8217;s shallower at about 85 feet deep, which should shave a minute or two from the time to surface. However, the bus transfer environment is much worse and the car tunnel project is largely to blame.</p>



<div class="wp-block-image"><figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32.png"><img loading="lazy" decoding="async" width="1024" height="580" data-attachment-id="130030" data-permalink="https://old.theurbanist.org/2022-01-13-32/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32.png" data-orig-size="1429,810" data-comments-opened="0" data-image-title="SLU DT-2 station cross-section" data-image-description="" data-image-caption="&lt;p&gt;The alternative SLU station is at Mercer Street and is 85 feet deep. (Sound Transit)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32-1024x580.png" src="https://www.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32-1024x580.png" alt="" class="wp-image-130030" srcset="https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32-1024x580.png 1024w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32-768x435.png 768w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32-741x420.png 741w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32-696x395.png 696w, https://old.theurbanist.org/wp-content/uploads/2022/01/2022-01-13-32.png 1429w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>The alternative South Lake Union station is at Mercer Street and is 85 feet deep. (Credit: Sound Transit)</figcaption></figure></div>



<p class="wp-block-paragraph">With the viaduct replacement project, WSDOT redesigned Aurora Avenue to have a left exit for traffic not entering the car tunnel under Seattle. This traffic included buses weaving over from the right-hand bus lanes on Aurora. Because they&#8217;d be in the process of weaving and exiting the off-ramp, there&#8217;s no good place for southbound Aurora buses to stop near the Mercer Street station. The weave has also slowed buses down, especially during peak times, which is exacerbated by the fact WSDOT provided no bus lanes on the new off-ramp and no transit priority on the widened 7th Avenue. Needless to say, this was not a transit-oriented project. And there&#8217;s not an easy or cheap way to fix it since the left-hand exit is baked into the street design now, barring a complete overhaul.</p>



<h2 class="wp-block-heading" id="salvaging-the-situation">Salvaging the situation</h2>



<p class="wp-block-paragraph">What&#8217;s done is done, but hopefully we learn our lessons from it and adapt the best we can. </p>



<p class="wp-block-paragraph">The station may have to go at Harrison since getting the bus transfers right is important, but we can mitigate the ill effects of the highway tunnel. WSDOT could help pay the additional cost of excavating the station deeper since it was their project that caused the issue, failing to make good on promises to improve transit. WSDOT could also fund a sound wall to deaden the sound of the highway emanating up to Harrison Street, which would make for a more pleasant station area.</p>



<p class="wp-block-paragraph">Sound Transit should also do everything possible at other station sites to <a rel="noreferrer noopener" href="https://www.theurbanist.org/2022/01/31/dear-sound-transit-prioritize-rider-experience-take-a-mulligan-on-west-seattle-and-ballard-link/" data-type="post" data-id="131256" target="_blank">ensure stations are user-friendly</a> and closer to the surface. South Lake Union Station may need to be 120-feet-deep to clear the SR-99 tunnel, but perhaps the agency will engineer a way for the new Westlake Station to be shallower than the 135 feet planned and find a way to make the 80-foot-deep option at Chinatown-International District work instead of alternatives ranging as deep as 190 feet. The Westlake and Chinatown stations will be essential to get right as the busiest stations and the only ones providing transfers between all three future light rail lines.</p>



<p class="wp-block-paragraph">The <a rel="noreferrer noopener" href="https://www.theurbanist.org/2016/12/16/first-look-downtown-south-lake-union-mha-rezones/" target="_blank">zoning </a>in this part of South Lake Union already allows for 240-foot residential towers, while 160-foot towers are allowed on the <a rel="noreferrer noopener" href="https://www.theurbanist.org/2017/10/02/seattle-city-council-approves-uptown-rezone-design-review-improvements/" target="_blank">Uptown </a>side (west of Aurora). These height limits could be doubled or tripled to allow for a double or tripling of the Mandatory Housing Affordability (MHA) requirements in the area. A doubling could take the mandatory affordability requirement from its current 3.9% of units or a fee of $11.59 per square foot to 8% or $24 per square foot. A tripling could take it to 12% of units or $35 per square foot &#8212; a highrise project might pay something like $20 million under such a fee. This would aid in a dense mixed-income neighborhood growing around the station, overcoming the obstacle that the nearby highway presents.</p>



<figure class="wp-block-image size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown.jpg"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="131616" data-permalink="https://old.theurbanist.org/harrisonstreetuptown/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown.jpg" data-orig-size="1600,1200" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1643214384&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="HarrisonStreetUptown" data-image-description="" data-image-caption="&lt;p&gt;Sound Transit is currently deciding if Harrison Street will get a promised light rail station near Aurora Avenue. Harrison Street leads right into a pedestrian-only corridor through the Seattle Center after crossing busy 5th Avenue. (Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-1024x768.jpg" alt="" class="wp-image-131616" srcset="https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-1536x1152.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2022/02/HarrisonStreetUptown.jpg 1600w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>Harrison Street leads right into a pedestrian-only corridor through the Seattle Center after crossing busy 5th Avenue. The Seattle City Light site on the left could present a TOD opportunity. (Photo by author)</figcaption></figure>



<p class="wp-block-paragraph">Eventually with more electric vehicles on the road, the tunnel exhaust tubes in the neighborhood would stop belching out as much pollution, although the tire dust from electric cars will still be a significant source of pollution <a rel="noreferrer noopener" href="https://www.theurbanist.org/2020/12/22/saving-salmon-will-require-a-transportation-revolution/" data-type="post" data-id="100751" target="_blank">threatening salmon runs</a>. Electric cars would still be noisy at high speeds and remain a drawback on the section of Harrison Street near the station, but a sound wall could mitigate the situation a bit. Transit-oriented development will still arrive near the station, including a social housing tower above the Sound Transit site.</p>



<div class="wp-block-image"><figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126.jpg"><img loading="lazy" decoding="async" width="1024" height="671" data-attachment-id="131617" data-permalink="https://old.theurbanist.org/homelessencampmentgatesfoundation_20220126/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126.jpg" data-orig-size="1435,941" data-comments-opened="0" data-image-meta="{&quot;created_timestamp&quot;:&quot;1643214189&quot;,&quot;orientation&quot;:&quot;1&quot;}" data-image-title="HomelessEncampmentGatesFoundation_20220126" data-image-description="" data-image-caption="&lt;p&gt;A homeless encampment on the east edge of Aurora Avenue, with the Gates Foundation in the background. (Photo by Doug Trumm)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126-1024x671.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126-1024x671.jpg" alt="" class="wp-image-131617" srcset="https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126-1024x671.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126-768x504.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126-640x420.jpg 640w, https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126-696x456.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/02/HomelessEncampmentGatesFoundation_20220126.jpg 1435w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>A homeless encampment on the east edge of Aurora Avenue. In the background, looms the Space Needle and the Gates Foundation, which has the mission of &#8220;fighting poverty, disease, and inequity around the world.&#8221; The encampment speaks to the fact that fight isn&#8217;t going particularly well in their own backyard. (Photo by author)</figcaption></figure></div>



<p class="wp-block-paragraph">The Gates Foundation is planning an expansion of its campus situated northwest of the station site, which breaks up Taylor Avenue due to a dubious street vacation from decades past. While the Gates Foundation operates a closed campus &#8212; it&#8217;s literally fenced off from the rest of the city &#8212; a pedestrian pathway through the large superblock would improve the walkshed to the station.</p>



<div class="wp-block-image"><figure class="aligncenter size-large"><a href="https://www.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey.jpg"><img loading="lazy" decoding="async" width="1024" height="700" data-attachment-id="131631" data-permalink="https://old.theurbanist.org/2022/02/04/sr-99-tunnel-threatens-south-lake-unions-light-rail-future/north-seattle-car-barn-then-mr-by-lawton-gowey/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey.jpg" data-orig-size="1462,1000" data-comments-opened="0" data-image-title="north-seattle-car-barn-then-mr-by-lawton-gowey" data-image-description="" data-image-caption="&lt;p&gt;This streetcar barn is now home to the Gates Foundation headquarters. (Photo courtesy of Lawton Gowey)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-1024x700.jpg" src="https://www.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-1024x700.jpg" alt="" class="wp-image-131631" srcset="https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-1024x700.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-768x525.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-614x420.jpg 614w, https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-218x150.jpg 218w, https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey-696x476.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2022/02/north-seattle-car-barn-then-mr-by-lawton-gowey.jpg 1462w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /></a><figcaption>This streetcar barn, pictured here in 1936, is now home to the Gates Foundation headquarters. (Photo courtesy of Lawton Gowey)</figcaption></figure></div>



<p class="wp-block-paragraph">Long before the City sold the site to the Gates Foundation for its headquarters, it <a rel="noreferrer noopener" href="https://pauldorpat.com/2015/10/24/seattle-now-then-the-north-seattle-trolley-yard/" target="_blank">hosted a trolley barn</a> for the Seattle Electric Company&#8217;s <a rel="noreferrer noopener" href="https://www.flickr.com/photos/sdot_photos/4110256341" target="_blank">extensive streetcar network</a>. Those streetcars were phased out and tracks were ripped out or paved over in the 1940s &#8212; although some of the routes were converted to electric trolley buses using the overhead wire for the former trams. Now in the 2020s, we find ourselves trying to shoehorn rapid transit back into a neighborhood that used to be at the nexus of Seattle&#8217;s transit network.</p>



<figure class="wp-block-image size-full"><a href="https://www.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35.png"><img loading="lazy" decoding="async" width="834" height="500" data-attachment-id="42208" data-permalink="https://old.theurbanist.org/2017/07/14/lake2bay-street-design-concept-plan-adopted-formal-rule/screen-shot-2017-07-04-at-19-00-35/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35.png" data-orig-size="834,500" data-comments-opened="1" data-image-title="2017 plan for Thomas Street" data-image-description="" data-image-caption="&lt;p&gt;Standalone bike facilities had been the extent of an earlier, since amended plan for Thomas Street between 5th Ave N and Taylor Ave N. (City of Seattle / Walker Macy)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35.png" src="https://www.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35.png" alt="" class="wp-image-42208" srcset="https://old.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35.png 834w, https://old.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35-768x460.png 768w, https://old.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35-701x420.png 701w, https://old.theurbanist.org/wp-content/uploads/2017/07/Screen-Shot-2017-07-04-at-19.00.35-696x417.png 696w" sizes="auto, (max-width: 834px) 100vw, 834px" /></a><figcaption>Standalone bike facilities on Thomas Street between 5th Ave N and Taylor Ave N. (Credit: City of Seattle / Walker Macy)</figcaption></figure>



<p class="wp-block-paragraph">The central artery of the neighborhood will likely be Thomas Street, just one block south. Thomas Street is designated a greenway and has been <a rel="noreferrer noopener" href="https://www.theurbanist.org/2019/11/06/thomas-street-in-south-lake-union-to-get-traffic-diverter-protected-intersection/" target="_blank">envisioned </a>as a pedestrianized corridor. The City backed off from developing a fully pedestrianized street and closing it to cars, but it did add flexpost protected bike lanes from the Seattle Center to Cascade, providing some street calming. Another plus: Thomas Street isn&#8217;t directly adjacent to a highway trench, which confers a basic urban ambiance lacking one block over. Along the street is a mix of recently added or planned mid-rise and older low-rise building that could great transit-oriented redevelopment opportunities. Seattle City Light has a large site that includes a substation. Some of it may have to remain, but perhaps a TOD site could be carved off the campus to add social housing on a city-owned property.</p>



<p class="wp-block-paragraph">The whole situation would be more favorable without a busy highway next door, but that is the mess we find ourselves in. A whole generation of political leaders assured us Seattle could have a downtown highway tunnel, great transit, and high quality public spaces too. Plans to add a light station in South Lake Union and connect it to pedestrian corridors and Aurora buses will put those assurances to the test.</p>



<p class="wp-block-paragraph"><em><strong>Correction</strong>: An earlier version incorrectly stated the exhaust tubes on Harrison regularly vented car exhaust. In fact, they&#8217;re only used in emergency situations like fires. Most of the car pollution vents out the tunnel portals due to &#8220;piston action&#8221; which still leaves the South Lake Union Station site getting a heavy dose of car pollution.</em></p>



<figure class="wp-block-embed is-type-wp-embed is-provider-the-urbanist wp-block-embed-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="j9MCYigKNF"><a href="https://www.theurbanist.org/2022/01/14/deep-seattle-light-rail-stations-other-st3-details-emerging-ahead-of-january-28-draft-plan-release/">Deep Seattle Light Rail Stations, Other ST3 Details Emerging Ahead of Draft Plan Release</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Deep Seattle Light Rail Stations, Other ST3 Details Emerging Ahead of Draft Plan Release&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2022/01/14/deep-seattle-light-rail-stations-other-st3-details-emerging-ahead-of-january-28-draft-plan-release/embed/#?secret=scb3kJBYMF#?secret=j9MCYigKNF" data-secret="j9MCYigKNF" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure>



<figure class="wp-block-embed is-type-wp-embed is-provider-the-urbanist wp-block-embed-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="kehMqNnxEX"><a href="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/">It&#8217;s a Thing that WSDOT Is Spending $4.4 Million Begging People to Drive</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;It&#8217;s a Thing that WSDOT Is Spending $4.4 Million Begging People to Drive&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/embed/#?secret=oPbYqp6xG7#?secret=kehMqNnxEX" data-secret="kehMqNnxEX" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure><p>The post <a href="https://old.theurbanist.org/2022/02/04/sr-99-tunnel-threatens-south-lake-unions-light-rail-future/">SR-99 Tunnel Threatens South Lake Union’s Light Rail Future</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">131581</post-id>	</item>
		<item>
		<title>Battery Portal: A New Park for Belltown</title>
		<link>https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/</link>
					<comments>https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/#respond</comments>
		
		<dc:creator><![CDATA[Natalie Bicknell Argerious]]></dc:creator>
		<pubDate>Thu, 02 Jan 2020 19:30:42 +0000</pubDate>
				<category><![CDATA[Parks and Public Space]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=83532</guid>

					<description><![CDATA[<p>It&#8217;s official, Belltown is getting a new park at the Battery Portal Site as part of the Waterfront Seattle project. At about three acres, the future Battery Portal Park will bring much needed green space into one of the Seattle&#8217;s densest residential neighborhoods. The park also represents a victory for Recharge the Battery, a community [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/">Battery Portal: A New Park for Belltown</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">It&#8217;s official, Belltown is getting a new park at the Battery Portal Site as part of the <a href="https://waterfrontseattle.org">Waterfront </a><a rel="noreferrer noopener" aria-label="Seattle (opens in a new tab)" href="https://waterfrontseattle.org" target="_blank">Seattle</a> project. At about three acres, the future Battery Portal Park will bring much needed green space into one of the Seattle&#8217;s densest residential neighborhoods. The park also represents a victory for <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.rechargethebattery.org" target="_blank">Recharge the Battery</a>, a community driven initiative <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.theurbanist.org/2018/12/19/visions-of-a-green-future-for-battery-street/" target="_blank">advocating for improvements</a> along the Battery Street Corridor.</p>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="1433" height="484" data-attachment-id="83574" data-permalink="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/screen-shot-2019-12-31-at-12-59-38-pm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM.png" data-orig-size="1433,484" data-comments-opened="1" data-image-title="Screen Shot 2019-12-31 at 12.59.38 PM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM-1024x346.png" src="https://i1.wp.com/www.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM.png?fit=696%2C235&amp;ssl=1" alt="A map illustrating the current Waterfront Seattle work zones including the future site of Battery Portal Park, which has been identified in dark pink at the far north end of the map. The Battery Portal site will continued to be used for construction staging as WSDOT continues to decommission and fill for the former Battery Street Tunnel. (Credit: Seattle Office of the Waterfront)" class="wp-image-83574" srcset="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM.png 1433w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM-1024x346.png 1024w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM-768x259.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM-1244x420.png 1244w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.59.38-PM-696x235.png 696w" sizes="auto, (max-width: 1433px) 100vw, 1433px" /><figcaption>A map illustrating the current Waterfront Seattle work zones including the future site of Battery Portal Park, which has been identified in dark pink at the far north end of the map. The Battery Portal site will continued to be used for construction staging as WSDOT continues to decommission the former Battery Street Tunnel. (Credit: Seattle Office of the Waterfront)</figcaption></figure></div>



<p class="wp-block-paragraph">Aaron Asis, a founding member of Recharge the Battery, said the design of the future Battery Portal Park will be completed in conjunction with the Bell Street Park Extension, offering opportunity for two projects to tie into each other. During the coming year, the City of Seattle and landscape architecture firm GGN will work with Recharge the Battery to hold public events that encourage community engagement with the design planning process. Additionally, a citizen advisory committee made up of delegates who represent different Belltown neighborhood interests will also be convened.</p>



<div class="wp-block-image"><figure class="aligncenter is-resized"><img loading="lazy" decoding="async" data-attachment-id="83572" data-permalink="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/screen-shot-2019-12-31-at-12-32-45-pm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.32.45-PM.png" data-orig-size="484,428" data-comments-opened="1" data-image-title="Screen Shot 2019-12-31 at 12.32.45 PM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.32.45-PM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.32.45-PM.png" alt="This map closeup shows the location of the future park, which will occupy about three acres between Western and 1st and Battery and Bell Streets. (Credit: Recharge the Battery)" class="wp-image-83572" width="377" height="334" srcset="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.32.45-PM.png 484w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.32.45-PM-475x420.png 475w" sizes="auto, (max-width: 377px) 100vw, 377px" /><figcaption>This map closeup shows the location of the future park, which will occupy about three acres between Western and 1st Avenues and Battery and Bell Streets. (Credit: Recharge the Battery)</figcaption></figure></div>



<p class="wp-block-paragraph">For Asis, relationship and trust building among Belltown neighbors will be key to successful a community engagement process. &#8220;The part that is important to us is to not intimate the public,&#8221; Asis said. &#8220;Our goal is to dig a little deeper and continue to get to know people in the neighborhood.&#8221;</p>



<span id="more-83532"></span>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="800" height="562" data-attachment-id="83579" data-permalink="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/screen-shot-2019-12-31-at-1-12-58-pm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294.png" data-orig-size="800,562" data-comments-opened="1" data-image-title="Bell Street Park" data-image-description="" data-image-caption="&lt;p&gt;Bell Street Park, a shared street with park features such as enhanced seating, greenery, and a design that supports traffic calming, will be extended from 1st Avenue to Elliot Avenue. Designing the Bell Street Park extension at the same time as Battery Portal Park offers the opportunity to create a &amp;#8220;cohesive design that honors the Belltown neighborhood,&amp;#8221; Asis said. (Credit: TIA International Photography)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294.png" src="https://www.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294.png" alt="Bell Street Park, a shared street with park features such as enhanced seating, greenery, and a design that supports traffic calming, will be extended from 1st Avenue to Elliot Avenue. Designing the Bell Street Park extension at the same time as Battery Portal Park offers the opportunity to create a &quot;cohesive design that honors the Belltown neighborhood,&quot; Asis said. (Credit: TIA International Photography)" class="wp-image-83579" srcset="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294.png 800w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294-768x540.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294-598x420.png 598w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294-696x489.png 696w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.12.58-PM-e1577992446294-100x70.png 100w" sizes="auto, (max-width: 800px) 100vw, 800px" /><figcaption>Bell Street Park, a shared street with park features such as enhanced seating, greenery, and a design that supports traffic calming, will be extended from 1st Avenue to Elliot Avenue. Designing the Bell Street Park extension at the same time as Battery Portal Park offers the opportunity to create a &#8220;cohesive design that honors the Belltown neighborhood,&#8221; Asis said. (Credit: TIA International Photography)</figcaption></figure></div>



<h2 class="wp-block-heading">A bold vision for a greener Belltown</h2>



<p class="wp-block-paragraph">Recharge the Battery first attracted the Seattle&#8217;s attention with their plans to convert the Battery Street Tunnel into a <a rel="noreferrer noopener" aria-label="subterranean open space (opens in a new tab)" href="https://www.theurbanist.org/2018/01/25/help-recharge-battery-street-tunnel/" target="_blank">subterranean open space</a>. When the high cost of preserving the tunnel proved an insurmountable barrier for attracting the political support necessary to move the project forward, the campaign restyled itself as <a href="https://www.theurbanist.org/2018/04/11/recharge-battery-advocates-back-new-promenade-vision/" target="_blank" rel="noreferrer noopener" aria-label="Recharge the Battery 2.0 (opens in a new tab)">Recharge the Battery 2.0</a>, with the Battery Portal Park topping the campaign&#8217;s wishlist for improvements within and near the Battery Street Corridor. </p>



<div class="wp-block-image"><figure class="aligncenter"><img decoding="async" data-attachment-id="83580" data-permalink="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/screen-shot-2019-12-31-at-1-29-58-pm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.29.58-PM-e1577993060253.png" data-orig-size="800,491" data-comments-opened="1" data-image-title="Battery Portal Park" data-image-description="" data-image-caption="&lt;p&gt;GGN, the landscape architecture firm that will design the Battery Portal Park, has earned national recognition for projects such as the Lurie Garden at Millennium Park in Chicago (shown above) and the African American Museum in Washington D.C. (Credit: GGN)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.29.58-PM-e1577993060253.png" src="https://www.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-1.29.58-PM-1024x629.png" alt="GGN, the landscape architecture firm that will design the Battery Portal Park, has earned national recognition for projects such as the Lurie Garden at Millennium Park in Chicago (shown above) and the African American Museum in Washington D.C. (Credit: GGN)" class="wp-image-83580"/><figcaption>GGN, the landscape architecture firm that will design the Battery Portal Park, has earned national recognition for projects such as the Lurie Garden at Millennium Park in Chicago (shown above) and the African American Museum in Washington D.C. (Credit: GGN)</figcaption></figure></div>



<p class="wp-block-paragraph">Recharge the Battery is thrilled to have GGN landscape architects as project partners, welcoming the &#8220;opportunity to explore options with professional firepower&#8221; brought by GGN&#8217;s design team.</p>



<p class="wp-block-paragraph">At the same time, Asis has been also careful to emphasize the important role the Belltown community will play in determining the park&#8217;s future. &#8220;We want to stress that this whole thing came about of the spirit of Belltown,&#8221; Asis said &#8220;We have been making friends and looking at ways to make things better. Because we now have professionals and city on our side, we don&#8217;t want to turn our backs on what got us here.&#8221;</p>



<p class="wp-block-paragraph">While many details about Battery Portal Park&#8217;s future design remain to be decided, some promising concepts have already arisen during Recharge the Battery&#8217;s community engagement sessions. Among these include ensuring the site has a community component such as a shared planting operation, maintaining the historic integrity of the site, and possibly building a Seattle Public Utilities demonstration site that would offer interpretative exhibits on stormwater collection in collaboration with <a href="http://www.growingvinestreet.com" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Growing Vine Street,</a> a Belltown neighborhood initiative which has worked toward transforming eight blocks of nearby Vine Street into an urban watershed and street park.</p>



<p class="wp-block-paragraph">Those who have been keeping tabs on this story might be familiar with the fact the Battery Portal Site has been floated as a potential location for a future Downtown Seattle public school. While there are currently no plans to locate a public school at the site, the possibility has not been ruled out. In the meantime, outdoor classroom space is another design feature that is up for consideration in the future Battery Portal Park.</p>



<h2 class="wp-block-heading">For now construction staging will continue dominate the Battery Portal Site</h2>



<p class="wp-block-paragraph">While Belltown residents have a future park to look forward to in 2022, for now the Battery Portal Site will continue to be filled with noise and commotion resulting from decommissioning of the former Battery Street Tunnel. </p>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="699" height="464" data-attachment-id="83570" data-permalink="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/screen-shot-2019-12-31-at-12-56-50-pm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.50-PM.png" data-orig-size="699,464" data-comments-opened="1" data-image-title="Screen Shot 2019-12-31 at 12.56.50 PM" data-image-description="" data-image-caption="&lt;p&gt;A truck unloads rubble from the demolition of the Alaskan Way Viaduct into the tunnel. WSDOT has warned of increased noise, dust and vibration around the tunnel site as crews work to decommission tunnel. Currently the project is expected to be complete late 2020 or early 2021, pathing the way for the future Battery Portal Park. (Credit: WSDOT )&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.50-PM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.50-PM.png" alt="A truck unloads rubble from the demolition of the Alaskan Way Viaduct into the tunnel. WSDOT has warned of increased noise, dust and vibration around the tunnel site as crews work to decommission tunnel. Currently the project is expected to be complete late 2020 or early 2021, pathing the way for the future Battery Portal Park. (Credit: WSDOT )" class="wp-image-83570" srcset="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.50-PM.png 699w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.50-PM-633x420.png 633w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.50-PM-696x462.png 696w" sizes="auto, (max-width: 699px) 100vw, 699px" /><figcaption>A truck unloads rubble from the demolition of the Alaskan Way Viaduct into the tunnel. WSDOT has warned of increased noise, dust and vibration around the tunnel site as crews work to decommission tunnel. Currently the project is expected to be complete late 2020 or early 2021, pathing the way for the future Battery Portal Park. (Credit: WSDOT )</figcaption></figure></div>



<p class="wp-block-paragraph">At this point most, if not all, of the rubble from the Alaskan Way Viaduct has been deposited into the tunnel. However, additional work such as removing&nbsp;the tunnel’s utility and mechanical systems and removing&nbsp;hazardous materials from the tunnel remain to be completed. The final step will be to fill the remainder of the tunnel with approximately 4,000 truck loads of low-density cellular concrete, which will be pumped into the tunnel through surface vents along Battery Street. </p>



<div class="wp-block-image"><figure class="aligncenter is-resized"><img loading="lazy" decoding="async" data-attachment-id="83571" data-permalink="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/screen-shot-2019-12-31-at-12-56-29-pm/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.29-PM.png" data-orig-size="730,377" data-comments-opened="1" data-image-title="Screen Shot 2019-12-31 at 12.56.29 PM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.29-PM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.29-PM.png" alt="Descriptions of the work that will be completed in Phase 1 (lining it with rubble) and Phase 2 (filling it with conrete) during the decommission of the former Battery Street Tunnel. (Credit: WSDOT)" class="wp-image-83571" width="574" height="296" srcset="https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.29-PM.png 730w, https://old.theurbanist.org/wp-content/uploads/2019/12/Screen-Shot-2019-12-31-at-12.56.29-PM-696x359.png 696w" sizes="auto, (max-width: 574px) 100vw, 574px" /><figcaption>Descriptions of the work that will be completed in Phase 1 and Phase 2 during the decommission of the former Battery Street Tunnel. (Credit: WSDOT)</figcaption></figure></div>



<p class="wp-block-paragraph">Once this work is completed, the land that occupies the site of the future Battery Portal Park will be returned from WSDOT&#8217;s ownership to the City of Seattle, honoring an easement agreement that was made decades ago and making way for a new, greener future for Belltown. <br></p><p>The post <a href="https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/">Battery Portal: A New Park for Belltown</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2020/01/02/battery-portal-a-new-park-for-belltown/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">83532</post-id>	</item>
		<item>
		<title>The Law of Induced Demand: Road Widening (and I-976) Invites Congestion</title>
		<link>https://old.theurbanist.org/2019/11/12/the-law-of-induced-demand-road-widening-and-i-976-invites-congestion/</link>
					<comments>https://old.theurbanist.org/2019/11/12/the-law-of-induced-demand-road-widening-and-i-976-invites-congestion/#respond</comments>
		
		<dc:creator><![CDATA[Doug Trumm]]></dc:creator>
		<pubDate>Tue, 12 Nov 2019 21:30:38 +0000</pubDate>
				<category><![CDATA[Decongestion Pricing]]></category>
		<category><![CDATA[Driving]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<category><![CDATA[Transportation]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=77733</guid>

					<description><![CDATA[<p>The four-billion-dollar-and-counting SR-99 tunnel was supposed to relieve congestion. It&#8217;s been open nine months, but people getting around on Seattle streets and highways probably don&#8217;t feel too relieved. Traffic congestion continues to be a part of life in booming Seattle, and tunnel tolling, which started Saturday, may just move more traffic from the tunnel to [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2019/11/12/the-law-of-induced-demand-road-widening-and-i-976-invites-congestion/">The Law of Induced Demand: Road Widening (and I-976) Invites Congestion</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">The <a rel="noreferrer noopener" aria-label="four-billion-dollar-and-counting (opens in a new tab)" href="https://www.theurbanist.org/2017/04/06/bertha/" target="_blank">four-billion-dollar-and-counting</a> SR-99 tunnel was supposed to <a rel="noreferrer noopener" aria-label="relieve congestion (opens in a new tab)" href="https://www.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/" target="_blank">relieve congestion</a>. It&#8217;s been open nine months, but people getting around on Seattle streets and highways probably don&#8217;t feel too relieved. Traffic congestion continues to be a part of life in booming Seattle, and <a rel="noreferrer noopener" href="https://www.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/" target="_blank">tunnel tolling, which started Saturday,</a> may just move more traffic from the tunnel to city streets.</p>



<p class="wp-block-paragraph">For the widen highways crowd, the opening of the <a href="https://www.theurbanist.org/2016/11/03/waterfront-design-predictably-disappoints-seattle/">Alaskan Way boulevard</a> (in the footprint of the <a rel="noreferrer noopener" aria-label="mercifully dismantled highway viaduct (opens in a new tab)" href="https://www.theurbanist.org/2019/01/15/highway-viaducts-are-bad-and-seattle-is-better-without-one/" target="_blank">mercifully dismantled highway viaduct</a>) is the light at the end of the tunnel. But that surface megaboulevard&#8211;<a rel="noreferrer noopener" aria-label="eight lanes (opens in a new tab)" href="https://www.theurbanist.org/2016/11/03/waterfront-design-predictably-disappoints-seattle/" target="_blank">eight lanes</a> at its widest&#8211;isn&#8217;t likely to solve congestion either. Traffic tends to fill the vessel it is given&#8211;more a gas than a liquid.</p>



<p class="wp-block-paragraph">This is counterintuitive. Motorists&#8211;many of armchair traffic engineers themselves&#8211;often assume wider roads mean less traffic congestion. Billion of dollars have been wasted on this folk wisdom&#8211;often with transportation departments <a href="https://www.thestranger.com/seattle/nothing-goes-here/Content?oid=17661" target="_blank" rel="noreferrer noopener" aria-label="aiding its dissemination (opens in a new tab)">aiding its dissemination</a>. The problem is there is no practical evidence for this belief. In fact, a <a rel="noreferrer noopener" aria-label="2011 study (opens in a new tab)" href="https://www.aeaweb.org/articles?id=10.1257/aer.101.6.2616" target="_blank">2011 study</a> by economists Matthew Turner of the University of Toronto and Gilles Duranton of University of Pennsylvania demonstrated traffic and road capacity have a perfect one-to-one relationship. Add lanes and they fill as fast as you add them. This means expensive highway expansion projects historically have ended with overall congestion just as bad as when the project was initiated.</p>



<p class="wp-block-paragraph">This is the principle of induced demand. Make it cheap and easy to drive and motorists will drive more. Unfortunately this well established though often ignored principle means that <strong>Tim Eyman&#8217;s Initiative 976 will worsen traffic congestion: $30 car tabs will encourage more people to drive and more often. </strong>Cheap car tabs will create more traffic at the same time that transportation agencies face decimated budgets due to the sudden loss of car tab revenue. This underscores the <a rel="noreferrer noopener" aria-label="need to backfill I-976 transit cuts (opens in a new tab)" href="https://www.theurbanist.org/2019/11/07/dear-state-democrats-its-on-you-to-repair-the-damage-i-976-has-wrought/" target="_blank">need to backfill I-976 transit cuts</a>.</p>



<p class="wp-block-paragraph">Moreover, the law of induced demand suggests a particularly effective way to raise revenue would be with fees that hit motorists like car tabs did. The <a rel="noreferrer noopener" aria-label="commercial parking tax (opens in a new tab)" href="https://www.theurbanist.org/2017/01/17/boost-parking-lot-tax/" target="_blank">commercial parking tax</a> would serve this purpose, as would <a rel="noreferrer noopener" aria-label="congestion pricing (opens in a new tab)" href="https://www.theurbanist.org/2018/04/05/mayor-durkan-backs-congestion-pricing-delays-basic-bike-network/" target="_blank">congestion pricing</a>, or decongestion pricing as we would call it. Induced demand also suggests that establishing dedicated bus lanes by simply painting over general purpose lanes wouldn&#8217;t create traffic Armageddon. In fact, it would improve matters by offering a scalable climate-friendly alternative while leaving road congestion largely unchanged.</p>



<p class="wp-block-paragraph">The relationship between road capacity and congestion really is that persistent. Adam Mann with <em>Wired</em> talked to the authors of that 2011 road congestion study, <a rel="noreferrer noopener" aria-label="explaining their findings (opens in a new tab)" href="https://www.wired.com/2014/06/wuwt-traffic-induced-demand/" target="_blank">explaining their findings</a>.</p>



<span id="more-77733"></span>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p>[Turner and Duranton] decided to compare the amount of new roads and highways built in different U.S. cities between 1980 and 2000, and the total number of miles driven in those cities over the same period.</p><p><br>“We found that there’s this perfect one-to-one relationship,” said Turner.</p><p><br>If a city had increased its road capacity by 10 percent between 1980 and 1990, then the amount of driving in that city went up by 10 percent. If the amount of roads in the same city then went up by 11 percent between 1990 and 2000, the total number of miles driven also went up by 11 percent. It’s like the two figures were moving in perfect lockstep, changing at the same exact rate.</p></blockquote>



<p class="wp-block-paragraph">The law of induced demand cuts both ways. Transit might get some motorists off the road, but others rise to take their place. But unlike highway widening, transit scales. Adding transit may not lower congestion, but overall capacity to move people goes up as service increases, especially if that transit is reliable and efficient thanks to dedicated lanes. The same can be said of protected bike lanes, which can fit more people per square foot of road space.</p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="703" height="527" data-attachment-id="36796" data-permalink="https://old.theurbanist.org/2017/02/10/uber/seattlemodespace_kw8dast/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2017/01/SeattleModeSpace_kw8DaST.gif" data-orig-size="703,527" data-comments-opened="1" data-image-title="SeattleModeSpace_kw8DaST" data-image-description="" data-image-caption="&lt;p&gt;Taxis inevitably consume more street space than transit. (Geekwire)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2017/01/SeattleModeSpace_kw8DaST.gif" src="https://www.theurbanist.org/wp-content/uploads/2017/01/SeattleModeSpace_kw8DaST.gif" alt="Graphic shows how many people fit in the same streets with cars, taxis, buses, bikes and on foot. Buses, bikes, and walking and rolling fit way more people. (Geekwire)" class="wp-image-36796"/><figcaption>How much street space people consume depends on their vehicle. Buses, bikes, walking, and rolling fit way more people per street than cars do. (Geekwire)</figcaption></figure>



<p class="wp-block-paragraph">The passage of I-976 puts us in a bind, but the solution is right before us. Progressively taxing and investing in transit can reverse our losses and put us back marching forward and seizing our role as a national leader in transit and <a rel="noreferrer noopener" aria-label="breaking car dependence (opens in a new tab)" href="https://www.theurbanist.org/2019/11/04/seattleites-are-ditching-cars-for-bikes-and-transit/" target="_blank">breaking car dependence</a>.</p>



<p class="wp-block-paragraph">Almost 60% of King County voters rejected I-976&#8211;and an even greater share of Seattle voters. And, as I <a rel="noreferrer noopener" aria-label="noted last week (opens in a new tab)" href="https://www.theurbanist.org/2019/11/06/i-976-passed-cutting-175000-hours-of-metro-bus-service-but-king-county-planning-to-sue-to-overturn/" target="_blank">noted last week</a>, King County&nbsp;<a rel="noreferrer noopener" href="https://www.theurbanist.org/2016/11/09/st3-passed-heres-how-and-whats-next/" target="_blank">passed Sound Transit 3</a>&nbsp;with 58% of the vote and approved the ultimately doomed <a rel="noreferrer noopener" href="https://www.theurbanist.org/2018/11/07/carbon-fee-goes-down-but-democrats-make-midterm-gains/" target="_blank">I-1631 carbon fee initiative</a>&nbsp;with 58%. King County is ready to embrace the future rather than cling to childish notions that roads can be free, driving cheap, and congestion nonexistent.</p><p>The post <a href="https://old.theurbanist.org/2019/11/12/the-law-of-induced-demand-road-widening-and-i-976-invites-congestion/">The Law of Induced Demand: Road Widening (and I-976) Invites Congestion</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2019/11/12/the-law-of-induced-demand-road-widening-and-i-976-invites-congestion/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">77733</post-id>	</item>
		<item>
		<title>Seattle Squeeze 2.0? SR-99 Tolling Could Divert Traffic to City Streets</title>
		<link>https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/</link>
					<comments>https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/#respond</comments>
		
		<dc:creator><![CDATA[Doug Trumm]]></dc:creator>
		<pubDate>Sat, 09 Nov 2019 01:11:18 +0000</pubDate>
				<category><![CDATA[Driving]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<category><![CDATA[Transportation]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=77664</guid>

					<description><![CDATA[<p>Motorists have been able to use the new four-billion-dollar SR-99 Alaskan Way Viaduct replacement tunnel for free since it opened February 4th. That will change Saturday as the Washington State Department of Transportation (WSDOT) begins tolling the tunnel. Tolling will lead to some diversion of car traffic from the tunnel to Downtown streets and that [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/">Seattle Squeeze 2.0? SR-99 Tolling Could Divert Traffic to City Streets</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">Motorists have been able to use the new four-billion-dollar SR-99 Alaskan Way Viaduct replacement tunnel for free since it opened February 4th. That will change Saturday as the Washington State Department of Transportation (WSDOT) begins tolling the tunnel. Tolling will lead to some diversion of car traffic from the tunnel to Downtown streets and that could negatively impact other road users by clogging bus lanes and crosswalks. The question is how much.</p>



<p class="wp-block-paragraph">Tolls will range from $1 to $2.25 for drivers with a Good To Go pass, depending on time of day. Drivers without a Good To Go pass will pay $2 more, meaning a range of $3 to $4.25. Vehicles with additional axles will pay more. The&nbsp;<a rel="noreferrer noopener" href="http://www.wstc.wa.gov/HighwayTolling/default.htm" target="_blank">Washington State Transportation Commission</a>&nbsp;set the toll rates in October 2018, after a five-month-long public input process. WSDOT has been seeking to educate motorists with an advertising blitz building of its earlier <a rel="noreferrer noopener" aria-label="&quot;It's a Thing&quot; campaign (opens in a new tab)" href="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/" target="_blank">&#8220;It&#8217;s A Thing&#8221; campaign</a> that sought to entice people to drive in the SR-99 tunnel.</p>



<p class="wp-block-paragraph">The Washington State Legislature&#8217;s financing plan for the viaduct replacement project relied on tolling to cover $200 million worth of the construction bonds and all of the upkeep and maintenance costs. Thus, removing tolling isn&#8217;t a viable option without coming up with a major new funding source. Especially since the State (or even the City) could be <a rel="noreferrer noopener" aria-label="on the hook for the projects considerable cost overruns  (opens in a new tab)" href="https://www.theurbanist.org/2017/04/06/bertha/" target="_blank">on the hook for all or some of the project&#8217;s considerable cost overruns </a>after the <a rel="noreferrer noopener" aria-label="Bertha breakdown saga (opens in a new tab)" href="https://www.theurbanist.org/2014/06/17/wsdots-repair-plan-for-bertha/" target="_blank">Bertha breakdown</a> <a rel="noreferrer noopener" aria-label="saga (opens in a new tab)" href="https://www.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/" target="_blank">saga</a>.</p>



<h2 class="wp-block-heading">Weaker Demand for 99 Tunnel than Predicted</h2>



<p class="wp-block-paragraph">In our <a href="https://twitter.com/UrbanistOrg/status/1092956789899816965" target="_blank" rel="noreferrer noopener" aria-label="earlier coverage (opens in a new tab)">earlier coverage</a>, we&#8217;ve raised the issue of whether SR-99 traffic volumes will be sufficient to cover the costs, given that the highway has underperformed projections thus far, particularly in its <a href="https://www.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/">first few months.</a></p>



<span id="more-77664"></span>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="1048" height="485" data-attachment-id="77669" data-permalink="https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/image-190/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/11/image.png" data-orig-size="1048,485" data-comments-opened="1" data-image-title="image" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/11/image-1024x474.png" src="https://i1.wp.com/www.theurbanist.org/wp-content/uploads/2019/11/image.png?fit=696%2C322&amp;ssl=1" alt="SR 99 volume was predicted to go up more than 30% at peak times after the tunnel opened but before tolling began. That hasn't happened. It's basically flat. (Credit: WSDOT) " class="wp-image-77669" srcset="https://old.theurbanist.org/wp-content/uploads/2019/11/image.png 1048w, https://old.theurbanist.org/wp-content/uploads/2019/11/image-1024x474.png 1024w, https://old.theurbanist.org/wp-content/uploads/2019/11/image-768x355.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/11/image-908x420.png 908w, https://old.theurbanist.org/wp-content/uploads/2019/11/image-696x322.png 696w" sizes="auto, (max-width: 1048px) 100vw, 1048px" /><figcaption>SR-99 volume was predicted to go up more than 30% at peak times after the tunnel opened but before tolling began. That hasn&#8217;t happened. It&#8217;s basically flat. (Credit: WSDOT) </figcaption></figure></div>



<p class="wp-block-paragraph">WSDOT is reporting that traffic volumes are up considerably now, but still below predicted levels of nearly 7,000 vehicles per hour. &#8220;75,000-80,000 vehicles use the tunnel on any given weekday,&#8221; WSDOT spokesperson Laura Newborn said. &#8220;Also, approximately 25,000 vehicles use the exits to city streets at either end of the tunnel on any given weekday. This means more than 100,000 vehicles use the SR 99 to/through Seattle daily.&#8221;</p>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="723" height="406" data-attachment-id="77667" data-permalink="https://old.theurbanist.org/99tunnel/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/11/99tunnel.png" data-orig-size="723,406" data-comments-opened="1" data-image-title="99tunnel" data-image-description="" data-image-caption="&lt;p&gt;Traffic volumes in the SR-99 tunnel. (Graphic by Ryan Packer)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/11/99tunnel.png" src="https://www.theurbanist.org/wp-content/uploads/2019/11/99tunnel.png" alt="Traffic volumes in the SR-99 tunnel peak around 4pm just shy of 6,000 vehicles per hour pre-tolling. Tolling could divert as much as 40% of traffic to city streets initially WSDOT predicts. (Graphic by Ryan Packer)" class="wp-image-77667" srcset="https://old.theurbanist.org/wp-content/uploads/2019/11/99tunnel.png 723w, https://old.theurbanist.org/wp-content/uploads/2019/11/99tunnel-696x391.png 696w" sizes="auto, (max-width: 723px) 100vw, 723px" /><figcaption>Traffic volumes in the SR-99 tunnel peak around 4pm just shy of 6,000 vehicles per hour pre-tolling. Tolling could divert as much as 40% of traffic to city streets initially WSDOT predicts. (Graphic by Ryan Packer)</figcaption></figure></div>



<p class="wp-block-paragraph">Traffic volumes peak at the 4pm hour according to WSDOT data, but still don&#8217;t exceed 6,000 vehicles even then. Overall peak periods in the SR-99 tunnel are averaging 5,352 vehicles per hour in the latest data we saw.</p>



<h2 class="wp-block-heading">Diverting Traffic to City Streets</h2>



<p class="wp-block-paragraph">Even below projections, traffic volumes are high enough that thousands of motorists are likely to be diverted to city streets to avoid tolls&#8211;at least at first in reaction to the sticker shock of tolls.</p>



<p class="wp-block-paragraph">&#8220;Our forecast suggests diversion could be as high as 35% to 40% during peak periods,&#8221; Newborn said. &#8220;However, we want to stress that forecasts are not certainties. When tolling began on 520, drivers initially diverted to other routes, but many returned to 520 over time. We expect to see something similar with the 99 tunnel. Some percentage of drivers will initially try other routes and return to the tunnel as they&nbsp;weigh the cost-vs-time saved in using the tunnel to get through Seattle.&#8221;</p>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="742" height="496" data-attachment-id="77670" data-permalink="https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/image-1-6/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/11/image-1.png" data-orig-size="742,496" data-comments-opened="1" data-image-title="image (1)" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/11/image-1.png" src="https://www.theurbanist.org/wp-content/uploads/2019/11/image-1.png" alt="In the 40% diversion worst-case scenario more than 2,000 vehicles per hour could divert to city street at peak times. (Graphic by Ryan Packer)" class="wp-image-77670" srcset="https://old.theurbanist.org/wp-content/uploads/2019/11/image-1.png 742w, https://old.theurbanist.org/wp-content/uploads/2019/11/image-1-628x420.png 628w, https://old.theurbanist.org/wp-content/uploads/2019/11/image-1-696x465.png 696w" sizes="auto, (max-width: 742px) 100vw, 742px" /><figcaption>In the 40% diversion worst-case scenario more than 2,000 vehicles per hour could divert to city street at peak times. (Graphic by Ryan Packer)</figcaption></figure></div>



<p class="wp-block-paragraph">WSDOT also advised their diversion forecasts were conservative&#8211;in other words they predicted a lot of diversion in case that came to pass&#8211;for the sake of securing bonds.</p>



<p class="wp-block-paragraph">&#8220;WSDOT’s forecast of tunnel volumes&nbsp;<span>with</span>&nbsp;tolling were part of a revenue study to make sure we were able to generate enough toll revenue to pay back $200 million in construction bonds used to build the tunnel,&#8221; Newborn said. &#8220;It’s important to note that our diversion forecasts were conservative for the bond market.&#8221;</p>



<p class="wp-block-paragraph">We asked why the projections were off, and WSDOT admitted predicting vehicle demand is not an exact science.</p>



<p class="wp-block-paragraph">&#8220;The forecast model over-projected the number of vehicles per hour in peak periods using the tunnel,&#8221; Newborn said.&nbsp;&#8220;Again, traffic modeling is not an exact science. Exits/entrances in the tunnel are different than the viaduct, but 75,000-80,000 roughly mirrors the last viaduct usage study conducted in 2014.&#8221;</p>



<p class="wp-block-paragraph">WSDOT appears to be hoping that diversion is a lot less than the 40% worst case scenario so that tolling revenue is sufficient for its bond repayment and maintenance needs. Since volumes started lower than projections, there&#8217;s less wiggle room. But on the other hand, there are a few options to cover the shortfalls such as raising tunel toll rates and/or tolling city streets to drive more traffic back into the tunnel.</p>



<h2 class="wp-block-heading">Could Congestion Pricing Help Balance Demand?</h2>



<p class="wp-block-paragraph">In fact, SR-99 tunnel tolling studies launched Seattle&#8217;s exploration of congestion pricing (or <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.theurbanist.org/2019/08/01/decongestion-pricing-and-what-candidates-said-about-it/" target="_blank">decongestion pricing</a> if you prefer) since Councilmember Mike O&#8217;Brien and others worried tolling the tunnel could drive motorists onto City streets and worsen transit gridlock, pedestrian collisions, and pollution. Councilmember O&#8217;Brien asked for congestion pricing, and Mayor Jenny Durkan later <a rel="noreferrer noopener" aria-label="picked up the idea (opens in a new tab)" href="https://www.theurbanist.org/2018/04/05/mayor-durkan-backs-congestion-pricing-delays-basic-bike-network/" target="_blank">picked up the idea</a> as a sort of centerpiece to her <a rel="noreferrer noopener" aria-label="climate action plan (opens in a new tab)" href="https://www.theurbanist.org/2018/04/06/seattles-climate-action-plan-plan-inaction/" target="_blank">climate action plan</a>. Though she ordered a study&#8211;and Uber <a rel="noreferrer noopener" aria-label="joined in on the act (opens in a new tab)" href="https://www.theurbanist.org/2019/07/19/uber-pushing-congestion-pricing/" target="_blank">joined in on the act</a> hoping to influence policy&#8211;it doesn&#8217;t appear that Mayor Durkan will meet her goal of enacting the policy in her first term at the rate we&#8217;re going.</p>



<p class="wp-block-paragraph">On the other hand, if <a rel="noreferrer noopener" aria-label="Tim Eyman's Initiative 976 stands (opens in a new tab)" href="https://www.theurbanist.org/2019/11/06/i-976-passed-cutting-175000-hours-of-metro-bus-service-but-king-county-planning-to-sue-to-overturn/" target="_blank">Tim Eyman&#8217;s Initiative 976 stands</a> without the Washington State Legislature stepping in to <a rel="noreferrer noopener" aria-label="backfill the transit cuts (opens in a new tab)" href="https://www.theurbanist.org/2019/11/07/dear-state-democrats-its-on-you-to-repair-the-damage-i-976-has-wrought/" target="_blank">backfill the transit cuts</a>, there could be a stronger appetite for new revenue and an opportunity to move congestion pricing policy forward. Never waste a crisis, they say.</p>



<p class="wp-block-paragraph"><em>Ryan Packer contributed to this article.</em></p><p>The post <a href="https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/">Seattle Squeeze 2.0? SR-99 Tolling Could Divert Traffic to City Streets</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2019/11/08/sr-99-tolling-starts-tomorrow-and-could-divert-traffic-to-city-streets/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">77664</post-id>	</item>
		<item>
		<title>Viadoom Never Came but Squeeze Tightens Its Grip on Seattle Post-Tunnel</title>
		<link>https://old.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/</link>
					<comments>https://old.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/#respond</comments>
		
		<dc:creator><![CDATA[Doug Trumm]]></dc:creator>
		<pubDate>Thu, 07 Feb 2019 19:56:37 +0000</pubDate>
				<category><![CDATA[Cycling]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<category><![CDATA[Transit]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=64553</guid>

					<description><![CDATA[<p>On Tuesday, the Move All Seattle Sustainably (MASS) coalition released a post-mortem report on the three-week viaduct closure and proclaimed the success of non-car commutes. &#8220;The closure of the Alaskan Way Viaduct was hyped as a potential traffic disaster that Seattle would have to endure for three weeks,&#8221; MASS stated in its press release. &#8220;Instead [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/">Viadoom Never Came but Squeeze Tightens Its Grip on Seattle Post-Tunnel</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">On Tuesday, the Move All Seattle Sustainably (MASS) coalition released a post-mortem <a rel="noreferrer noopener" aria-label="report  (opens in a new tab)" href="https://www.masscoalition.org/what-did-we-learn-from-viadoom" target="_blank">report</a> on the three-week viaduct closure and proclaimed the success of non-car commutes.</p>



<p class="wp-block-paragraph">&#8220;The closure of the Alaskan Way Viaduct was hyped as a potential traffic disaster that Seattle would have to endure for three weeks,&#8221; MASS stated in its <a rel="noreferrer noopener" aria-label="press release (opens in a new tab)" href="https://static1.squarespace.com/static/5bdf7cc67c93279afce7aa35/t/5c59f363e2c483271a494f78/1549398883546/MASSPressRelease020519.pdf" target="_blank">press release</a>. &#8220;Instead we saw more people on transit and bikes, and a blessedly quiet downtown. The twenty buses Metro added turned out to be much nicer than the 90,000 cars that formerly streamed across our waterfront and up Aurora Ave.&#8221;</p>



<p class="wp-block-paragraph">The three-week exercise doesn&#8217;t mean the fight to lower car dependency is over. In fact, traffic actually seemed to be worse this week with the tunnel open, foreshadowing plenty of work ahead.</p>



<p class="wp-block-paragraph">“‘Viadoom’ is over but the Seattle Squeeze is not. We hope the experience of these three weeks will embolden Mayor Durkan and SDOT to move forward with dramatic improvements to transit, biking, walking and rolling infrastructure, as recommended by the MASS Coalition,” said Katie Wilson, General Secretary of the Transit Riders Union, a MASS coalition member. “‘Build it and they will come’&#8211;all the evidence points in this direction.”</p>



<h2 class="wp-block-heading">SDOT Tries to Explain Lack of Viadoom</h2>



<p class="wp-block-paragraph">That same day, Heather Marx, who is the director of downtown mobility for the Seattle Department of Transportation (SDOT), briefed the transportation committee of the Seattle City Council on data from the closure and what the agency learned from it. She admitted she underestimated the potential of bikes to move people, referring to when she called getting more people to bike in January &#8220;a heavy lift.&#8221;</p>



<p class="wp-block-paragraph">&#8220;I&#8217;ve never been so happy to be so wrong,&#8221; Marx said, pointing to <a rel="noreferrer noopener" aria-label=" bike counts that jumped big time (opens in a new tab)" href="https://www.theurbanist.org/2019/02/04/seattles-bike-counters-smashed-records-in-january/" target="_blank">bike counts that jumped big time</a>, even doubling at the West Seattle Bridge.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="550" data-dnt="true"><p lang="en" dir="ltr">&quot;I&#39;ve never been so happy to be so wrong,&quot; SDOT mobility director Heather Marx said in her <a href="https://twitter.com/hashtag/viaductshutdown?src=hash&amp;ref_src=twsrc%5Etfw">#viaductshutdown</a> briefing. She had painted January biking as a &quot;heavy lift.&quot; Instead Seattle crushed bike count records for the month. <a href="https://twitter.com/hashtag/SEAbikes?src=hash&amp;ref_src=twsrc%5Etfw">#SEAbikes</a> <a href="https://twitter.com/hashtag/realign99?src=hash&amp;ref_src=twsrc%5Etfw">#realign99</a> <a href="https://t.co/u3e34Re8ft">https://t.co/u3e34Re8ft</a></p>&mdash; The Urbanist (@UrbanistOrg) <a href="https://twitter.com/UrbanistOrg/status/1092934334024114176?ref_src=twsrc%5Etfw">February 5, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p class="wp-block-paragraph">Marx also said the water taxi saw ridership triple on its West Seattle route after <a rel="noreferrer noopener" aria-label="doubling service (opens in a new tab)" href="https://www.theurbanist.org/2018/12/21/extra-water-taxi-service-and-a-few-temporary-bus-lanes-planned-for-seattle-squeeze/" target="_blank">doubling service</a>. She credited teleworking as fueling the shift that made it seem like 90,000 cars disappeared that normally used the viaduct.</p>



<h2 class="wp-block-heading">Designing a Doom-Proof System</h2>



<p class="wp-block-paragraph">MASS emphasized that the viaduct closure should be a learning experience and help us avoid future mistakes like expanding highway capacity in an urban environment and gumming up bus routes, <a rel="noreferrer noopener" aria-label=" bike routes and pedestrian crossings (opens in a new tab)" href="https://www.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/" target="_blank">bike routes and pedestrian crossings</a>.</p>



<p class="wp-block-paragraph">“Viadoom turned out to be a wildly successful experiment in how to reduce emissions, improve mobility, and better our quality of life,” MASS stated. “Understanding why Viadoom didn&#8217;t happen can help us make future transportation policy decisions with equally happy results.”</p>



<span id="more-64553"></span>



<p class="wp-block-paragraph">MASS wants bus lanes, a complete safe biking network, a safe pedestrian network, and signal priority geared toward people walking, rolling, biking, and in transit. So far SDOT has taken an wait-and-see approach, promising it&#8217;s ready to add temporary bus lanes or signal changes as necessary.</p>



<div class="wp-block-image"><figure class="aligncenter"><img decoding="async" data-attachment-id="64645" data-permalink="https://old.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/img_20190207_082946709/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/02/IMG_20190207_082946709-e1550004403715.jpg" data-orig-size="2000,1500" data-comments-opened="1" data-image-title="IMG_20190207_082946709" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/02/IMG_20190207_082946709-e1550004403715-1024x768.jpg" src="https://i1.wp.com/www.theurbanist.org/wp-content/uploads/2019/02/IMG_20190207_082946709.jpg?fit=696%2C522&amp;ssl=1" alt="" class="wp-image-64645"/><figcaption>Tunnel-related congestion and buses missing in action led to a transit meltdown Thursday morning. (Photo by author)</figcaption></figure></div>



<p class="wp-block-paragraph">Bus lanes seem increasingly necessary. Just this morning <a rel="noreferrer noopener" aria-label="this reporter (opens in a new tab)" href="https://twitter.com/dmtrumm/status/1093555431014772736" target="_blank">this reporter</a> had the joy of a riding a jam-packed Route 62 into a Dexter traffic jam exacerbated by the new SR-99 tunnel off-ramp. The <a rel="noreferrer noopener" aria-label="Mercer Mes (opens in a new tab)" href="https://www.theurbanist.org/2017/04/28/ped-bridges-mercer-mess/" target="_blank">Mercer Mess</a> is <a rel="noreferrer noopener" aria-label="messier  (opens in a new tab)" href="https://t.co/fdOavaEBQt" target="_blank">messier </a>with a new traffic funnel feeding into it, as it should have been easy to predict if traffic engineers didn&#8217;t have their heads in the sand.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="550" data-dnt="true"><p lang="en" dir="ltr">WSDOT claims that it could not predict that the tunnel would create more traffic problems. Maybe we should not take take advice from highway builders about how to ensure mobility in urban places? <a href="https://t.co/M4VUDAXn4m">pic.twitter.com/M4VUDAXn4m</a></p>&mdash; Move All Seattle Sustainably (@MASScoalition) <a href="https://twitter.com/MASScoalition/status/1093305299329417217?ref_src=twsrc%5Etfw">February 7, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p class="wp-block-paragraph">With the closure behind us, it seems our government&#8217;s priorities have swung sharply back to cars. The Washington State Department of Transportation (WSDOT) is back to&nbsp;<a rel="noreferrer noopener" href="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/" target="_blank">begging people to drive</a> and <a rel="noreferrer noopener" aria-label="apparently  (opens in a new tab)" href="https://twitter.com/dongho_chang/status/1093582535496331264https://twitter.com/dongho_chang/status/1093582535496331264" target="_blank">apparently </a>closing a bus-only lane serving one of the busiest bus stops in Seattle.<br></p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="550" data-dnt="true"><p lang="en" dir="ltr">Believe that is not an approved closure. Requesting an inspector site visit. cc&#8230; <a href="https://twitter.com/seattledot?ref_src=twsrc%5Etfw">@seattledot</a> <a href="https://twitter.com/SDOTtraffic?ref_src=twsrc%5Etfw">@SDOTtraffic</a></p>&mdash; Dongho Chang (@dongho_chang) <a href="https://twitter.com/dongho_chang/status/1093582535496331264?ref_src=twsrc%5Etfw">February 7, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p class="wp-block-paragraph">Why did we go back to a car-first mentality? Even asking commuters not to drive in a concerted way (when so often we tip-toe around the issue) seemed to have an effect during the closure. </p>



<p class="wp-block-paragraph">“Preceding the Seattle Squeeze, our leaders provided some additional transportation infrastructure in the form of added buses, water taxis, and bus lanes, and prevailed on people to do the right thing,&#8221; said Alice Lockhart, with 350 Seattle’s transportation team. “The response was great, with bike counters up, water taxi use tripling, and more people on buses. This gives me hope that the Mayor’s office, SDOT, and Metro can bravely lead to build and also promote the transit, bike lanes, and pedestrian/rolling infrastructure that will let us all get to work without high-carbon commutes.”</p>



<h2 class="wp-block-heading">Snow Spoils Tunnel Launch</h2>



<p class="wp-block-paragraph">Meanwhile in car land, a winter storm wreaked havoc on Seattle streets and spoiled WSDOT&#8217;s rollout of its $4 billion new tunnel, with traffic volumes down sharply from the 90,000 cars per day that used to use the Alaskan Way Viaduct. By the way, WSDOT predicts SR-99 traffic volumes will actually increase about 35% before tunnel tolling starts this summer.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="550" data-dnt="true"><p lang="en" dir="ltr">This just in! During its first day open (Monday, Feb. 4) &#8211; a day with snow and ice and low traffic volumes everywhere &#8211; 22,145 vehicles went through the new SR 99 tunnel! <a href="https://twitter.com/hashtag/99tunnel?src=hash&amp;ref_src=twsrc%5Etfw">#99tunnel</a> <a href="https://t.co/mSlgp1lE12">pic.twitter.com/mSlgp1lE12</a></p>&mdash; SR 99 (@BerthaDigsSR99) <a href="https://twitter.com/BerthaDigsSR99/status/1092936604530819072?ref_src=twsrc%5Etfw">February 6, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p class="wp-block-paragraph">With driving conditions improving on Wednesday, KIRO <a rel="noreferrer noopener" aria-label="reported  (opens in a new tab)" href="http://mynorthwest.com/1266193/sr99-tunnel-opens-2-mile-backup/" target="_blank">reported</a> a four-mile backup &#8220;nearly to the West Bridge&#8221; formed in the tunnel as the exits on the South Lake Union side of the tunnel couldn&#8217;t empty fast enough. Turns out the Mercer Mess isn&#8217;t the best place to put more cars.</p>



<figure class="wp-block-embed-twitter wp-block-embed is-type-rich is-provider-twitter"><div class="wp-block-embed__wrapper">
<blockquote class="twitter-tweet" data-width="550" data-dnt="true"><p lang="en" dir="ltr">Just how low is that 22k figure for opening day of the <a href="https://twitter.com/hashtag/99tunnel?src=hash&amp;ref_src=twsrc%5Etfw">#99tunnel</a>? Well it&#39;s about 20% of what WSDOT&#39;s predicted average traffic level pre-tolling. Once weather is more favorable, we&#39;ll see if their prediction of significantly higher SR-99 traffic than before comes to pass. <a href="https://t.co/4AfhXeZJQb">pic.twitter.com/4AfhXeZJQb</a></p>&mdash; The Urbanist (@UrbanistOrg) <a href="https://twitter.com/UrbanistOrg/status/1092956789899816965?ref_src=twsrc%5Etfw">February 6, 2019</a></blockquote><script async src="https://platform.twitter.com/widgets.js" charset="utf-8"></script>
</div></figure>



<p class="wp-block-paragraph">To further dampen the grand opening, the exhaust fans in the tunnel don&#8217;t seem to be operating properly yet, and the tunnel filled with &#8220;smoke and haze,&#8221; <a rel="noreferrer noopener" aria-label="according to KIRO (opens in a new tab)" href="https://www.kiro7.com/news/local/wsdot-looking-at-systems-in-new-sr-99-tunnel-after-smoke-haze/915851039" target="_blank">according to KIRO</a>. WSDOT manually triggered the giant yellow exhaust fans, but motorists were not happy to be breathing their own fumes. Cars, after all, are externalizing machines and bearing the full social costs of driving them isn&#8217;t part of the equation&#8211;even if it should be.</p>



<figure class="wp-block-embed is-type-rich is-provider-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="Fcuh2AAeOS"><a href="https://www.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/">Coming Tunnel Off-Ramp Adds to Danger for People Biking on Dexter Avenue</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;Coming Tunnel Off-Ramp Adds to Danger for People Biking on Dexter Avenue&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/embed/#?secret=9Bs9lvDLg7#?secret=Fcuh2AAeOS" data-secret="Fcuh2AAeOS" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure><p>The post <a href="https://old.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/">Viadoom Never Came but Squeeze Tightens Its Grip on Seattle Post-Tunnel</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2019/02/07/viadoom-never-came-but-squeeze-tightens-its-grip-on-seattle-post-tunnel/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">64553</post-id>	</item>
		<item>
		<title>An Elegy for a Tunnel Ribbon Cutting</title>
		<link>https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/</link>
					<comments>https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/#respond</comments>
		
		<dc:creator><![CDATA[Ryan Packer]]></dc:creator>
		<pubDate>Sun, 03 Feb 2019 19:59:39 +0000</pubDate>
				<category><![CDATA[Highways]]></category>
		<category><![CDATA[Politics and Government]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=64058</guid>

					<description><![CDATA[<p>After Ian Frazier Greetings, friends! We&#8217;ve gathered hereto cut the ribbon, give a cheer-it&#8217;s time to open, rise and shinethe buried tunnel ninety-nine. Oh, the group is large and grandbut we must know who to raise our handwith thankful gesture, sing it loudthe highway-funding political crowd? There&#8217;s Washdot Secretary Millar,Sam Zimbabwe, new transportation czar,there&#8217;s noted [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/">An Elegy for a Tunnel Ribbon Cutting</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph"><em>After Ian Frazier</em></p>



<p class="wp-block-paragraph">Greetings, friends! We&#8217;ve gathered here<br>to cut the ribbon, give a cheer-<br>it&#8217;s time to open, rise and shine<br>the buried tunnel ninety-nine.</p>



<p class="wp-block-paragraph">Oh, the group is large and grand<br>but we must know who to raise our hand<br>with thankful gesture, sing it loud<br>the highway-funding political crowd?<br><br>There&#8217;s Washdot Secretary Millar,<br>Sam Zimbabwe, new transportation czar,<br>there&#8217;s noted transit booster Dow,<br>and Chris Gregoire who&#8217;d decided how<br>to build this tunnel, years ago.<br>There&#8217;s Peter Steinbrueck, that old pro.<br>Councilmember Bagshaw&#8217;s here<br>Wrapping up her final year.<br>Oh look, it&#8217;s Governor Inslee<br>and Ed Murray, hiding behind a tree.<br>Oh and you thought I&#8217;d forgot<br>King County Councilmember Joe McDermott.</p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="1024" height="768" data-attachment-id="64077" data-permalink="https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/insleeribboncutting/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting.jpg" data-orig-size="1200,900" data-comments-opened="1" data-image-title="InsleeRibbonCutting" data-image-description="" data-image-caption="&lt;p&gt;Governor Inslee holds the ribbon high outside the North Portal to the new SR-99 tunnel. (Credit: WSDOT)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-1024x768.jpg" src="https://www.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-1024x768.jpg" alt="" class="wp-image-64077" srcset="https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-1024x768.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-768x576.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-560x420.jpg 560w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-696x522.jpg 696w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting-265x198.jpg 265w, https://old.theurbanist.org/wp-content/uploads/2019/02/InsleeRibbonCutting.jpg 1200w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /><figcaption>The leaders. (Photos by WSDOT)</figcaption></figure>



<p class="wp-block-paragraph">So many leaders gathered &#8217;round<br>while speeches and big smiles abound<br>what&#8217;s left unsaid is so damn large&#8230;<br>I&#8217;d hoped the people put in charge<br>of all our futures wouldn&#8217;t trade<br>a highway tunnel clearly made<br>to keep cars moving with no delay<br>for the health of kids born on this day.<br></p><p>The post <a href="https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/">An Elegy for a Tunnel Ribbon Cutting</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2019/02/03/an-elegy-for-a-tunnel-ribbon-cutting/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">64058</post-id>	</item>
		<item>
		<title>Durkan Tries for Last Word on SR-99 Tunnel Controversy</title>
		<link>https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/</link>
					<comments>https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/#respond</comments>
		
		<dc:creator><![CDATA[Natalie Bicknell Argerious]]></dc:creator>
		<pubDate>Wed, 30 Jan 2019 21:50:10 +0000</pubDate>
				<category><![CDATA[Driving]]></category>
		<category><![CDATA[Highways]]></category>
		<category><![CDATA[Parks and Public Space]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=63725</guid>

					<description><![CDATA[<p>Mayor Durkan defends building for car infrastructure even while admitting that &#8220;People in Seattle like transit.&#8221; Viaduct is closed?&#160;On the bus, nose in a book&#160;I hadn’t noticed — A Vaiku, by @140noStephen on October 27, 2011﻿ This haiku was written back in 2011 after the first Viadoom turned out to be a big disappointment for [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/">Durkan Tries for Last Word on SR-99 Tunnel Controversy</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<h4 class="wp-block-heading">Mayor Durkan defends building for car infrastructure even while admitting that &#8220;People in Seattle like transit.&#8221;</h4>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p>Viaduct is closed?&nbsp;<br>On the bus, nose in a book&nbsp;<br>I hadn’t noticed</p><cite>— A Vaiku, by @140noStephen on <a rel="noreferrer noopener" href="http://viadoom.com/post/12015976192/viaduct-is-closed-on-the-bus-nose-in-a-book-i" target="_blank">October 27, 2011﻿</a></cite></blockquote>



<p class="wp-block-paragraph">This haiku was written back in 2011 after the first <a href="http://viadoom.com">Viadoom</a> turned out to be a big disappointment for people who were craving for a post-apocalyptic traffic nightmare to play out on the city streets of Seattle&#8217;s downtown. </p>



<p class="wp-block-paragraph">Now we have almost reached the end of the second Viadoom, the one that was supposed to be so big and so bad that Seattleites would be left clawing at gates of the new deep bore tunnel SR-99 tunnel, desperate to pay <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://archive.kuow.org/post/funny-math-seattle-drivers-will-pay-1-billion-tolls-cover-200-million-debt" target="_blank">$1 billion in tolls</a> to order escape the 90,000 vehicles clogging the streets above. </p>



<p class="wp-block-paragraph">But that did not happen. Somehow the 90,000 vehicles that had been using the Alaskan Way Viaduct daily <a href="https://www.seattletimes.com/seattle-news/transportation/the-cars-just-disappeared-what-happened-to-the-90000-cars-a-day-the-viaduct-carried-before-it-closed/" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">disappeared</a>, and traffic proceeded on more or less as usual. </p>



<p class="wp-block-paragraph">Transit advocates, like former Mayor McGinn, have stated that there is a lesson to be learned. Chiefly that people are adaptable and can change their habits and modes of transportation. </p>



<p class="wp-block-paragraph">&#8220;It turns out,&#8221; said McGinn, in an interview on KUOW&#8217;s The Record, &#8220;that a lot of car trips aren&#8217;t that important. You can go into neighborhood to buy things instead of driving across town or you can pick a different time of day.&#8221;</p>



<p class="wp-block-paragraph">However, current Mayor Jenny Durkan does not share McGinn&#8217;s perspective. In fact instead of staying out of the old tunnel debate (which took place, after all, far before Durkan&#8217;s time in elected office), the Mayor jumped right in&#8211;with a vigorous defense of the tunnel. </p>



<h4 class="wp-block-heading">No SR-99 Tunnel. No Waterfront Park.</h4>



<p class="wp-block-paragraph">Mayor Durkan&#8217;s defense of the tunnel came directly after host Bill Radke asked if we could learn something from our experience with the viaduct closure and then played a clip from former Mayor McGinn.</p>



<p class="wp-block-paragraph">[To hear the complete interview, click on the link <a href="https://www.kuow.org/stories/what-bob-ferguson-does-when-he-s-not-suing-donald-trump" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">here</a>. The segment begins at 5:50.]</p>



<span id="more-63725"></span>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="1024" height="683" data-attachment-id="63770" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/tunnel_tour_32198662966/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-scaled.jpg" data-orig-size="2560,1707" data-comments-opened="1" data-image-meta="{&quot;aperture&quot;:&quot;4&quot;,&quot;camera&quot;:&quot;Canon EOS REBEL T3i&quot;,&quot;created_timestamp&quot;:&quot;1483515702&quot;,&quot;focal_length&quot;:&quot;17&quot;,&quot;iso&quot;:&quot;1250&quot;,&quot;shutter_speed&quot;:&quot;0.033333333333333&quot;}" data-image-title="Tunnel_Tour_(32198662966)" data-image-description="" data-image-caption="&lt;p&gt;Seattle City Council members tour the SR 99 tunnel. (Seattle City Council)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1024x683.jpg" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1024x683.jpg" alt="Seattle City Council members tour the SR-99 tunnel. After the election of anti-tunnel advocate Mike McGinn, the then City Council members overrode McGinn's tunnel veto. Photo credit: Seattle City Council" class="wp-image-63770" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1024x683.jpg 1024w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-768x512.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-1536x1024.jpg 1536w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-2048x1365.jpg 2048w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-630x420.jpg 630w, https://old.theurbanist.org/wp-content/uploads/2019/01/Tunnel_Tour_32198662966-696x464.jpg 696w" sizes="auto, (max-width: 1024px) 100vw, 1024px" /><figcaption>Seattle City Council members tour the SR-99 tunnel. After the election of anti-tunnel advocate Mike McGinn, the then City Council members overrode <a href="https://www.seattletimes.com/seattle-news/seattle-city-council-overrides-mcginns-tunnel-veto/">McGinn&#8217;s tunnel veto</a>. Photo credit: Seattle City Council</figcaption></figure>



<p class="wp-block-paragraph">After making the joke that McGinn&#8217;s continued criticism of the tunnel demonstrated that &#8220;people can&#8217;t change their habits because [McGinn] just can&#8217;t quit fighting or trying to prove he was right,&#8221; Durkan went on to suggest that the current traffic patterns would not be sustainable because they were the result of &#8220;a concerted effort by a whole host of users, employers, and others trying to both change their behavior on when they work and how they get to work.&#8221;</p>



<p class="wp-block-paragraph">And of course the word &#8220;vacation&#8221; was thrown out as a possible explanation for the lighter than expected traffic, bringing up images of Seattleites speckled across beaches from Santa Barbara to Cabo, sipping fruity cocktails during the long wait for the SR-99 tunnel.</p>



<p class="wp-block-paragraph">But then something even stranger happened. After applauding Seattleites&#8217; warm feelings toward transit, and even suggesting that certain transit improvements, such as more frequent <a href="https://www.kingcounty.gov/depts/transportation/water-taxi/west-seattle.aspx">Alki Water Taxi</a> service connecting West Seattle to downtown, could become permanent, Durkan went on to make an oddly declarative statement.</p>



<blockquote class="wp-block-quote is-layout-flow wp-block-quote-is-layout-flow"><p>It’s clear. Without that tunnel we would not be getting that 20 acre Waterfront Park that is going to [change] Seattle. So, you know, I’m glad that the voters finally decided what they decided and to move ahead with the tunnel.</p><cite><br></cite></blockquote>



<p class="wp-block-paragraph">Why Mayor Durkan would be so adamant about defending the tunnel decision may have to do with who her political allies are, such as tunnel champions former Governor Chris Gregoire and former Mayor Ed Murray.</p>



<h4 class="wp-block-heading">Fact Check: Did We Need a Tunnel to Get a Park?</h4>



<p class="wp-block-paragraph">A review of the evidence makes it clear that Mayor Durkan&#8217;s statement was either dishonest or based on deeply flawed logic. Plans to build a park on the waterfront date back as far as the <a href="https://www.theurbanist.org/2018/05/02/forward-thrust-part-1-no-city-island/" target="_blank" rel="noreferrer noopener" aria-label="Forward Thrust (opens in a new tab)">Forward Thrust</a> in 1968, in which voters approved <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://www.historylink.org/File/10666" target="_blank">$5 million for the development of a waterfront park</a>. </p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="819" height="560" data-attachment-id="63769" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/screen-shot-2019-01-30-at-10-57-57-am/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM.png" data-orig-size="819,560" data-comments-opened="1" data-image-title="Screen Shot 2019-01-30 at 10.57.57 AM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM.png" alt="" class="wp-image-63769" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM.png 819w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM-768x525.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM-614x420.png 614w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM-218x150.png 218w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-10.57.57-AM-696x476.png 696w" sizes="auto, (max-width: 819px) 100vw, 819px" /><figcaption>1970 Model of the initial Rockrise project for the Waterfront Park. (Credit: Seattle Municipal Archives)</figcaption></figure>



<p class="wp-block-paragraph">What is amazing is that people were already calling from the removal of the Alaskan Way Viaduct, which was then less than a decade old.</p>



<p class="wp-block-paragraph">But after it was revealed that viaduct removal would cost about <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://www.historylink.org/File/9983" target="_blank">$100 million</a>, critics backed off. A plan for a waterfront park developed by Rockrise &amp; Associates, a San Francisco-based consulting team, was tossed around in various iterations during the early 1970&#8217;s. Eventually a scaled-back version of the plan was implemented in 1974 with the creation of a waterfront park at Pier 58. However, because it lacked the planned waterside esplanade and improved connections to downtown, the park had a &#8220;poor circulation pattern&#8221; which led to it being quickly deemed a failure, and at times <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.seattletimes.com/seattle-news/special-reports/seattles-new-waterfront-what-it-might-look-like-and-why/https://www.seattletimes.com/seattle-news/special-reports/seattles-new-waterfront-what-it-might-look-like-and-why/" target="_blank">liability</a>.</p>



<p class="wp-block-paragraph">But people continued to press for a park. In 2002, after the Nisqually Earthquake, Allied Arts, led by then Executive Director David Yeaworth, began its<a href="http://alliedartsofseattle.org/allied-arts-timeline/" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)"> &#8220;Waterfront For All&#8221;</a> campaign, igniting a civic conversation about what the public wanted for their future waterfront. </p>



<figure class="wp-block-image"><img loading="lazy" decoding="async" width="793" height="472" data-attachment-id="63771" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/screen-shot-2019-01-30-at-11-15-48-am/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM.png" data-orig-size="793,472" data-comments-opened="1" data-image-title="Screen Shot 2019-01-30 at 11.15.48 AM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM.png" alt="" class="wp-image-63771" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM.png 793w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM-768x457.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM-706x420.png 706w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.15.48-AM-696x414.png 696w" sizes="auto, (max-width: 793px) 100vw, 793px" /><figcaption>The Allied Arts &#8220;Waterfront For All&#8221; <a href="http://new.alliedartsofseattle.org/wp-content/uploads/2014/06/AAS-WFA-Full-Report-2006.pdf" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">report</a> showcased images of the a downtown reconnected to its waterfront. The above image shows what the connection at Yesler Way in Pioneer Square could look like without the viaduct. (Credit: Stephanie Bowers)</figcaption></figure>



<p class="wp-block-paragraph">As conversation continued to muddle over the future of SR-99, the theme of creating a Waterfront Park that would operate as a &#8220;front porch&#8221; for the city and the &#8220;next great civic space&#8221; remained a constant. </p>



<p class="wp-block-paragraph">In 2007, Seattle voters voted &#8220;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.thestranger.com/seattle/no-and-hell-no/Content?oid=161447" target="_blank">No and Hell No</a>&#8221; to two different plans for installing a new freeway on the waterfront. More than 55% of voters opposed a new elevated highway (e.g., Viaduct 2.0), and interestingly, more than 70% opposed the four lane <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.thoughtco.com/methods-of-subway-construction-2798523" target="_blank">cut and cover tunnel</a> championed by then Mayor Greg Nickels.<br></p>



<p class="wp-block-paragraph">It was clear that Seattleites wanted a better future for their downtown waterfront.</p>



<p class="wp-block-paragraph">So when activists like Cary Moon&#8217;s People&#8217;s Waterfront Coalition began advocating for a surface street solution in lieu of a replacement viaduct or tunnel, creating a beautiful public waterfront was at the forefront of their plans.</p>



<p class="wp-block-paragraph">Moon, along with activist Grant Cogswell, developed a concept called the <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.metropolismag.com/uncategorized/do-the-strand-2/" target="_blank">&#8220;Seattle Strand.&#8221;</a> The design was a runner up in a 2004 competition by <a href="https://www.metropolismag.com" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Metropolis</a>, and focused creating a dynamic public space that would remove the viaduct and restore connections to the water&#8217;s edge, while improving habitat along the seawall. </p>



<p class="wp-block-paragraph">&#8220;We are a city that remembers its recent wilderness, a city in love with our watery terrain,” the proposal stated.</p>



<p class="wp-block-paragraph"><a href="https://www.theurbanist.org/2019/01/15/highway-viaducts-are-bad-and-seattle-is-better-without-one/" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">Controversy did continue</a> over whether or not improvements to surface streets and transit could handle the amount carried by the viaduct, with opposing sides presenting different data. </p>



<p class="wp-block-paragraph">Even so, there was never a serious plan to abandon the waterfront park. Even ill-fated efforts, such as State Rep. Frank Chopp&#8217;s plan to replace the viaduct with a &#8220;<a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://crosscut.com/2008/09/frank-chopps-megaduct-comes-out-hiding" target="_blank">Megaduct</a>&#8221; and the <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.theurbanist.org/2016/07/19/vote-no-on-seattle-initiative-123/" target="_blank">Initiative 123</a> plan to convert the viaduct into a High Line-style elevated park, paid heed to Seattleite&#8217;s desire to convert their waterfront into a great public space. </p>



<h4 class="wp-block-heading">What&#8217;s Going to Happen When All Those Cars Come Back?</h4>



<p class="wp-block-paragraph">WSDOT is spending&nbsp;<a href="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">$4.4 million</a> on a campaign to convince people to drive use the SR-99 tunnel. Current projections from WSDOT estimate that thousands more vehicle trips will be made through the tunnel during peak hours than were made on the former viaduct. </p>



<p class="wp-block-paragraph">However, because the tunnel will not have downtown exits and will have tolls starting this summer, <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://q13fox.com/2018/06/06/wsdot-expects-viaduct-project-to-push-tens-of-thousands-of-drivers-to-other-seattle-streets/" target="_blank">estimates from state&nbsp;transportation&nbsp;officials</a> have suggested that daily trips in the tunnel will be about a third less than were made on the viaduct resulting in roughly 30,000 more cars on downtown surface streets.</p>



<p class="wp-block-paragraph">Because of <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.citylab.com/transportation/2018/09/citylab-university-induced-demand/569455/" target="_blank">induced demand</a>, which posits that traffic congestion actually worsens after bigger roads are built because increasing the amount and size of roads encourages more people to drive, we can expect that amount of vehicle trips in and out of downtown will increase when the tunnel (and the <a rel="noreferrer noopener" aria-label=" new Alaskan Way mega-boulevard (opens in a new tab)" href="https://www.theurbanist.org/2016/11/03/waterfront-design-predictably-disappoints-seattle/" target="_blank">new Alaskan Way mega-boulevard</a> planned for the surface) opens, thus worsening congestion and carbon emissions.</p>



<p class="wp-block-paragraph">Such a development would fly in the face of the progress Seattle has made in recent year toward reducing the amount of vehicle trips made in the city. At the same our population has <a rel="noreferrer noopener" aria-label="boomed (opens in a new tab)" href="https://www.theurbanist.org/2017/05/26/blasting-past-700000/" target="_blank">boomed</a>, the number of vehicle trips has decreased while public transportation use has <a href="https://www.theurbanist.org/2017/03/03/2016-numbers-sound-transit-riding-high/" target="_blank" rel="noreferrer noopener" aria-label="increased (opens in a new tab)">increased</a>.</p>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="1173" height="581" data-attachment-id="63773" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/screen-shot-2019-01-30-at-11-47-50-am/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM.png" data-orig-size="1173,581" data-comments-opened="1" data-image-title="Screen Shot 2019-01-30 at 11.47.50 AM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM-1024x507.png" src="https://i1.wp.com/www.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM.png?fit=696%2C345&amp;ssl=1" alt="" class="wp-image-63773" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM.png 1173w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM-1024x507.png 1024w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM-768x380.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM-848x420.png 848w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM-696x345.png 696w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.47.50-AM-324x160.png 324w" sizes="auto, (max-width: 1173px) 100vw, 1173px" /></figure></div>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="770" height="492" data-attachment-id="63774" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/screen-shot-2019-01-30-at-11-48-15-am/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM.png" data-orig-size="770,492" data-comments-opened="1" data-image-title="Screen Shot 2019-01-30 at 11.48.15 AM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM.png" alt="" class="wp-image-63774" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM.png 770w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM-768x491.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM-657x420.png 657w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.15-AM-696x445.png 696w" sizes="auto, (max-width: 770px) 100vw, 770px" /></figure></div>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="787" height="449" data-attachment-id="63776" data-permalink="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/screen-shot-2019-01-30-at-11-48-23-am/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM.png" data-orig-size="787,449" data-comments-opened="1" data-image-title="Screen Shot 2019-01-30 at 11.48.23 AM" data-image-description="" data-image-caption="" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM.png" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM.png" alt="" class="wp-image-63776" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM.png 787w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM-768x438.png 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM-736x420.png 736w, https://old.theurbanist.org/wp-content/uploads/2019/01/Screen-Shot-2019-01-30-at-11.48.23-AM-696x397.png 696w" sizes="auto, (max-width: 787px) 100vw, 787px" /><figcaption>Credit: <a href="https://www.seattle.gov/Documents/Departments/SDOT/About/DocumentLibrary/Reports/2018_Traffic_Report.pdf" target="_blank" rel="noreferrer noopener" aria-label=" (opens in a new tab)">SDOT 2018 Traffic Report </a></figcaption></figure></div>



<p class="wp-block-paragraph">Data from the Seattle Department of Transportation (SDOT) along with more recent data acquired since the closure of the Alaskan Way Viaduct, suggests that Seattleites transportation habits have been changing, calling into question if it really was necessary to spend billions of dollars on new car infrastructure.</p>



<p class="wp-block-paragraph">In 2011, voters did vote to move ahead with the tunnel. But like the <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="http://features.crosscut.com/seattle-forward-thrust-sound-transit" target="_blank">vote to reject $900 million in grants</a> from the federal government for rapid transit in 1978, it is very possible that the tunnel vote was a big mistake.</p>



<p class="wp-block-paragraph">In order to move forward, Seattle&#8217;s leaders need to have to both the knowledge to understand our past, as well as the courage to question decisions that were made.</p>



<p class="wp-block-paragraph">Was it wise for Mayor Durkan to come immediately to the defense of the SR-99 tunnel, despite the mounting evidence that investment in transit could have more positive impact on Seattle&#8217;s mobility and the health of the natural environment? No. </p>



<p class="wp-block-paragraph">And was it fair for Mayor Durkan to use the Waterfront Park as an excuse for why we needed to invest billions of dollars into a tunnel intended to increase vehicle trips, thus increasing carbon emissions at a time in which we need to be taking dramatic actions to curb climate change? Hell no.                                                                                              <br></p><p>The post <a href="https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/">Durkan Tries for Last Word on SR-99 Tunnel Controversy</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2019/01/30/durkan-tries-for-last-word-on-sr-99-tunnel-controversy/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">63725</post-id>	</item>
		<item>
		<title>Coming Tunnel Off-Ramp Adds to Danger for People Biking on Dexter Avenue</title>
		<link>https://old.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/</link>
					<comments>https://old.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/#respond</comments>
		
		<dc:creator><![CDATA[Ryan Packer]]></dc:creator>
		<pubDate>Tue, 29 Jan 2019 15:00:17 +0000</pubDate>
				<category><![CDATA[Cycling]]></category>
		<category><![CDATA[SR-99 Tunnel]]></category>
		<category><![CDATA[Vision Zero]]></category>
		<guid isPermaLink="false">https://www.theurbanist.org/?p=63459</guid>

					<description><![CDATA[<p>Next week, when the Washington State Department of Transportation (WSDOT) opens its new tunnel underneath downtown Seattle as a new SR-99, the northern exit from the tunnel will dump high levels of traffic onto one of the busiest bike routes in Seattle. And the situation will be compounded by the design of the intersection where [&#8230;]</p>
<p>The post <a href="https://old.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/">Coming Tunnel Off-Ramp Adds to Danger for People Biking on Dexter Avenue</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></description>
										<content:encoded><![CDATA[<p class="wp-block-paragraph">Next week, when the Washington State Department of Transportation (WSDOT) opens its new tunnel underneath downtown Seattle as a new SR-99, the northern exit from the tunnel will dump high levels of traffic onto one of the busiest bike routes in Seattle. And the situation will be compounded by the design of the intersection where tunnel traffic meets city streets&#8211;on a corridor that has seen serious injuries to cyclists in the past and where the City has not acted.</p>



<p class="wp-block-paragraph">If you&#8217;re traveling northbound through the SR-99 tunnel and want to go downtown, drivers will find themselves on Republican Street making a right turn to get onto Dexter Avenue N. Dexter is a very heavily used bike route between Downtown and North Seattle: the route that saw a <a rel="noreferrer noopener" aria-label=" (opens in a new tab)" href="https://www.seattletimes.com/seattle-news/transportation/the-cars-just-disappeared-what-happened-to-the-90000-cars-a-day-the-viaduct-carried-before-it-closed/" target="_blank">40% increase</a> in bike traffic during the first few weeks of a post-viaduct Seattle.<br></p>



<div class="wp-block-image"><figure class="aligncenter"><img loading="lazy" decoding="async" width="777" height="398" data-attachment-id="63472" data-permalink="https://old.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/dwj-r3hucaut59o/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Dwj-R3hUcAUt59O.jpg" data-orig-size="777,398" data-comments-opened="1" data-image-title="" data-image-description="" data-image-caption="&lt;p&gt;Visualization of the exits from the 99 tunnel onto South Lake Union streets (WSDOT)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/Dwj-R3hUcAUt59O.jpg" src="https://www.theurbanist.org/wp-content/uploads/2019/01/Dwj-R3hUcAUt59O.jpg" alt="" class="wp-image-63472" srcset="https://old.theurbanist.org/wp-content/uploads/2019/01/Dwj-R3hUcAUt59O.jpg 777w, https://old.theurbanist.org/wp-content/uploads/2019/01/Dwj-R3hUcAUt59O-768x393.jpg 768w, https://old.theurbanist.org/wp-content/uploads/2019/01/Dwj-R3hUcAUt59O-696x357.jpg 696w" sizes="auto, (max-width: 777px) 100vw, 777px" /><figcaption>Visualization of the exits from the 99 tunnel onto South Lake Union streets (WSDOT)</figcaption></figure></div>



<p class="wp-block-paragraph">The hundreds of people per day who rely on Dexter to get to work do not have an easy time of it. After years of construction along Dexter, the bike lane is still not fully protected along the street, with blocks where only a painted line separates people on bikes from traffic. </p>



<span id="more-63459"></span>



<p class="wp-block-paragraph">On <a href="https://twitter.com/seattledot/status/1083159589355368449">Twitter</a>, the Seattle Department of Transportation (SDOT) responded to a question about whether drivers making the turn from Republican to Dexter from the off-ramp would be prohibited from doing so when the light is red and cyclists have the right of way: &#8220;We&#8217;ll be monitoring this location closely to ensure that it is safe for people on bikes and on foot. There won&#8217;t be a right turn on red restriction when the tunnel opens, but if we see safety concerns we will be ready to make adjustments.&#8221; </p>



<p class="wp-block-paragraph">Unfortunately, the City has been slow to respond when the lives of cyclists are put at risk, and even when they are lost.<br></p>



<p class="wp-block-paragraph">In July of 2011, Mike Wang was cycling south on Dexter Ave N when he was struck and killed by a driver making a left turn across the bike lane. The driver left the scene, and was later sentenced to a hefty prison term, but the underlying action that he took&#8211;turning left across a bike lane&#8211;was a perfectly legal way to use the street. The design of the intersection afforded little margin for error.</p>



<p class="wp-block-paragraph">Two years later, <a href="https://www.seattlebikeblog.com/2013/07/30/recovery-fund-started-for-man-seriously-injured-biking-home-on-dexter/">Brandon Blake</a> was seriously injured at another intersection on Dexter, by a driver turning left. Two years after that, <a href="https://www.seattletimes.com/seattle-news/transportation/video-captures-collision-between-cyclist-and-suv-driver-takes-off/">a helmet-mounted</a> camera captures another collision that thankfully only results in minor injuries but which was caused by the same dangerous turn.</p>



<div class="wp-block-image"><figure class="aligncenter"><img decoding="async" data-attachment-id="63457" data-permalink="https://old.theurbanist.org/img_-gul7yh/" data-orig-file="https://old.theurbanist.org/wp-content/uploads/2019/01/IMG_-gul7yh.jpg" data-orig-size="768,1024" data-comments-opened="1" data-image-meta="{&quot;orientation&quot;:&quot;1&quot;}" data-image-title="" data-image-description="" data-image-caption="&lt;p&gt;Dexter Ave N at Republican (Photo by the author)&lt;/p&gt;
" data-large-file="https://old.theurbanist.org/wp-content/uploads/2019/01/IMG_-gul7yh.jpg" src="https://www.theurbanist.org/wp-content/uploads/2019/01/IMG_-gul7yh-768x1024.jpg" alt="" class="wp-image-63457"/><figcaption>Dexter Ave N at Republican (Photo by the author)</figcaption></figure></div>



<p class="wp-block-paragraph">The city&#8217;s track record on failing to take action to remedy unsafe situations quickly after collisions occur is pretty clear, even just looking at the single example of Dexter Avenue, but there are many others. </p>



<p class="wp-block-paragraph">The safety implications of allowing free-right-on-red from a freeway onto one of the busiest bike routes in the city are obvious to most, but they should be most obvious to the Seattle Department of Transportation. However, the message of Vision Zero design&#8211;building a margin of error into all transportation infrastructure so that if the road user fails&#8211;is still not permeating into the entire department judging by this design. When longtime transportation reporters like <a href="https://twitter.com/MikeLindblom/status/1089567921754394625">Mike Lindblom</a> are pointing out the &#8220;safety hazard&#8221; that the department of transportation is apparently unconcerned about, there is a problem.</p>



<p class="wp-block-paragraph">Now we can only hope that no one is seriously injured before the department changes its mind.</p>



<figure class="wp-block-embed is-type-rich is-provider-the-urbanist"><div class="wp-block-embed__wrapper">
<blockquote class="wp-embedded-content" data-secret="xFzTix9CYl"><a href="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/">It&#8217;s a Thing that WSDOT Is Spending $4.4 Million Begging People to Drive</a></blockquote><iframe loading="lazy" class="wp-embedded-content" sandbox="allow-scripts" security="restricted"  title="&#8220;It&#8217;s a Thing that WSDOT Is Spending $4.4 Million Begging People to Drive&#8221; &#8212; The Urbanist" src="https://www.theurbanist.org/2019/01/24/its-a-thing-that-wsdot-is-spending-4-4-million-begging-people-to-drive/embed/#?secret=1z34FMVLcw#?secret=xFzTix9CYl" data-secret="xFzTix9CYl" width="600" height="338" frameborder="0" marginwidth="0" marginheight="0" scrolling="no"></iframe>
</div></figure><p>The post <a href="https://old.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/">Coming Tunnel Off-Ramp Adds to Danger for People Biking on Dexter Avenue</a> first appeared on <a href="https://old.theurbanist.org">The Urbanist</a>.</p>]]></content:encoded>
					
					<wfw:commentRss>https://old.theurbanist.org/2019/01/29/coming-tunnel-off-ramp-adds-to-danger-for-people-biking-on-dexter-avenue/feed/</wfw:commentRss>
			<slash:comments>0</slash:comments>
		
		
		<post-id xmlns="com-wordpress:feed-additions:1">63459</post-id>	</item>
	</channel>
</rss>
